13 resultados para asymmetry, ground reaction forces, barrier clearance, within foot loading
em University of Michigan
Resumo:
"Project Officer, Robert W. Puls, Subsurface Protection and Remediation Division."
Resumo:
Errata slip inserted in pt. 2.
Resumo:
"January 1970."
Resumo:
"February 1970."
Resumo:
Item 1005-C
Resumo:
Minnesota Department of Highways, St. Paul
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references (p. 100-103).
Resumo:
This guide examines the role of restoration of public services within the broader context of stability operations. The extent to which public service reconstruction takes place depends on the mission, the level of resources, and the host country context. This paper provides guidance helpful to U.S. peacekeeping personnel in planning and executing stability operations tasks related to restoration of public sector services and infrastructure. It is designed to supplement existing and emerging guidance, and is specifically relevant to addressing the needs of public sector rebuilding in a post-conflict situation by peacekeeping forces. The material presented here draws both from theory and analytic frameworks and from on-the-ground experience of practitioners.
Resumo:
Title within ornamental border.
Resumo:
Title within ornamental border.
Resumo:
Bibliographical foot-notes.
Resumo:
"Interim report no. 0-100 (NRC Insect control committee Report no. 100). A report to the Committee on medical research on work done under a transfer of funds, recommended by this committee, from the Office of scientific research and development to the Bureau of entomology and plant quarantine."--Foot-note, p. 1.