75 resultados para Semiclassical violation of the equivalence principle
em University of Michigan
Resumo:
Preface by M. Paul Hymans.--Meeting of the Belgian parliament (4th August, 1914)--Proclamation by King Albert to the Belgian army (5th August, 1914)--Observations on Belgian neutrality.--Proclamation by the Belgian government at Ostend (13th October, 1914)--Correspondence of H.M. the King of Belgium and the Belgian government with the President of the French republic (12th-14th October, 1914)
Resumo:
[Vol. I] includes a preface by J. van den Heuvel, minister of state, reports 1-12, and extracts from the pastoral letter of Cardinal Mercier, archbishop of Malines; vol. II includes reports 13-22, with facsimiles of German soldiers' diaries, correspondence between Cardinal Mercier and the German authorities, the protest of Mgr. Heylen, bishop of Namur, etc., etc., appended.
Report of the case of the Steamship Meteor, libelled for alleged violation of the Neutrality Act ...
Resumo:
I. Procedeings [sic] in the District Court of the United States for the Southern District of New York.--II. Proceedings in the Circuit Court of the United States for the Southern District of New York in the Second Circuit, and in the Supreme Court of the United States.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references.
Resumo:
Smith, J. Friends' books
Resumo:
Bibliography: p. [221]-222.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
The committee reporte that "the admission of Louisiana into the Union is a violation of the constitution."
Resumo:
Mode of access: Internet.
Resumo:
Includes index.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.