4 resultados para Rosemont

em University of Michigan


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

" ... official record of the meetings ... held by the Office of Solid Waste Management Programs, December 2 (Newark, N.J.), December 4 (Rosemont, Ill.), December 9 (Houston), and December 11 (San Francisco)."

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Journal of the Brotherhood of Railway and Steamship Clerks, Freight Handlers, Express and Station Employees.