8 resultados para Project Approach

em University of Michigan


Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Project no. AID-PHA/CM/C-73-33"--T.p. verso.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"The Bureau of Physical Research has prepared this report primarily from two reports submitted by Cornell Aeronautical Laboratory... 'Summary report of highway barrier analysis and test program' July 1961, and 'Analysis and prediction of the performance of highway barrier' October 1962."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"This is the second in a series of two reports dealing with longitudinal handling qualities in the landing approach." (see also TL/711/L3/C43+)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sunset project manager : Terry H. Stoica.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.