47 resultados para Heavy water reactors.
em University of Michigan
Resumo:
"United States Atomic Energy Commission, Savannah River Operations Office, Contract AT (38-1) 213, supplements 1 & 2."
Resumo:
Issues are simultaneously published in both the "TID" and "SL" Series, but numbering is different.
Resumo:
"June 1959."
Resumo:
"June 1959."
Resumo:
AEC Report No. TID-3091(SUPPL. 1).
Resumo:
Prepared under Contract AT(04-3)-165 for the U.S. Atomic Energy Commission, San Francisco Operations Office.
Resumo:
Prepared under Contract AT(04-3)-165 for the U.S. Atomic Energy Commission, San Francisco Operations Office.
Resumo:
"April 1981" (v. 1); "June 1981" (v. 2)
Resumo:
Cover title.
Resumo:
"Prepared under Contract AT(04-3)-165 with the United States Atomic Energy Commission."
Resumo:
"Reactor technology."
Resumo:
Work performed at the Physics Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee.
Resumo:
"Including errata of March 7, 1960 and Supplement No. 1, Revised March 11, 1960."
Resumo:
"Contract No. AT(40-1)-2589."
Resumo:
A total of 193 annotated references to unclassified reports on the design, development and construction of the Shippingport Pressurized Water Reactor is presented. Author, subject, and report number indexes are included.