196 resultados para School building


Relevância:

30.00% 30.00%

Publicador:

Resumo:

John Scott, architect. There is a discrepancy in building date. Sources cite both 1902 and 1896. Sarach Caswell Angell was the wife of James B. Angell. Barbour Gymnasium (for women) was attached to the north side of the Waterman Gymnasium.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lee Black & Kenneth Black, architects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Built in 1925 on the east side of E. University just east of the Old Medical Building. Name changed to Clarence Cook Little Science Building in 1970. Albert Kahn, architect

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Built 1908. Donaldson & Meier, architects. Facing North University; addition to northside (rear) 1923. Removed 1969. On verso: Editorial Office #38

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Built 1908. Donaldson & Meier, architects. Facing North University; addition to northside (rear) 1923. Removed 1969. Image reversed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Renamed East Hall in 1995. Built 1923. Smith, Hinchman & Grylls, architects. On verso: East Engineering Building from N.W. The small 2 story building was once the Fire Engine House for the 6th Ward. Part of old 6th Ward School (Tappan) shows at the left, now called East Hall.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building site, tower and elevator. No. 1 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction. Frieze Building in background

Relevância:

30.00% 30.00%

Publicador:

Resumo:

No. 2 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Second tower erected on left of potential building. No. 3 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction. Frieze Building in background

Relevância:

30.00% 30.00%

Publicador:

Resumo:

No. 4 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Steam shovel at work. No. 5 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Framework is going up on east end of building. No. 6 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Framework added to mid building and begun on west end. No. 7 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Framework nearly complete. Stonework begun on east end of building. No. 8 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Subfloor completed on first level. Some steel girders are up. No. 9 of chronological series of construction photographs, numbered 1 to 32. Smith, Hinchman & Grylls, architects. W.B. Wood Co., construction