156 resultados para Flood control.
Resumo:
"June, 1986."
Resumo:
"February, 1986."
Resumo:
Kept up to date by addendum.
Resumo:
"October, 1985."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
"This project is being done under the authority given by the Flood Control Act of 1945 (Ill. Rev. Stat. 1989, ch. 19, par. 126a et seq.)--leaf 1.
Resumo:
"Sources of information": p. 6-7.
Resumo:
Bibliography: p. 22-23.
Resumo:
Cover title.
Resumo:
"September 1993."
Resumo:
"June 1994."
Resumo:
Description based on: No. 38.
Resumo:
Mode of access: Internet.
Resumo:
"Presented by Mr. Darnay, in March 1972, to a seminar sponsored by the Urban Drainage and Flood Control District and the Denver Regional Council of Governments, Denver, Colorado": p. 14.
Resumo:
Description based on: 1981; title from cover.