392 resultados para digitalization of cuny special collection


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Submitted pursuant to House Joint Resolution number 72, dated January 18, 1980."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A private collection, made by Nathan Dunn and deposited in the Philadelphia museum, whence it was removed to London in 1842. cf. History of Philadelphia, by J.T. Scharf and T. Westcott, 1884, v. 2, p. 948-949.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Caption:The Committee,appointed to prepare an annual report on the affairs of the society, report:- Supplements the annual report of 1835.