90 resultados para Project control
Resumo:
Cover title.
Resumo:
This project is for the ecological rehabilitation of lagoons and natural communities at 24 parks within the Chicago Park District. The development of Chicago's lagoon system began shortly after the State of Illinois created the Chicago Park District in 1869. The lagoons were expanded over the next 50 years into 14 parks and they have become extremely important ecologic, recreation, and historic resources. A variety of factors over the last 140 years have contributed to the current deteriorated condition of the lagoons which require the expenditure of funds for major rehabilitation activities. Age of infrastructure, erosion, and sedimentation were the natural forces at work; however, the lagoons' popularity and lack of comprehensive management plan also contributed. All of the lagoons are eligible to be listed on the National Register of Historic places as major contributing features. Additionally, the lagoons in Columbus, Garfield, Humboldt, Jackson, Lincoln, Sherman and Washington Parks are historic landmarks. The Park District has already invested over $5 million for partial lagoon restoration at Humboldt, Douglas, Sherman, McKinley, Riis and Garfield Parks, and additional work is required.
Resumo:
A part of the ILCC Retail Education Program.
Resumo:
"Final Report, November 1997-October 1999."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
"This project is being done under the authority given by the Flood Control Act of 1945 (Ill. Rev. Stat. 1989, ch. 19, par. 126a et seq.)--leaf 1.
Resumo:
"IEPA/WPC/86-001."
Resumo:
"IEPA/WPC/82-001".
Resumo:
"IEPA/WPC/84-030."
Resumo:
"November, 1982."
Resumo:
"IEPA/WPC/83-003X."
Resumo:
"The Sierra Cooperative Pilot Project, United States Department of the Interior, Bureau of Reclamation, Division of Research, Office of Atmospheric Resources Management, Denver, Colorado."
Resumo:
Considers (90) S. 537, (90) S. 1144, , (90) S. 1215, (90) S. 1529, (90) S. 1549, (90) S. 1622 , (90) S. 1812, (90) S. 2024, (90) S. 2059, (90) S. 2169. (90) S. 2236,(90) S. 2611.
Resumo:
pt. 2 Report on management and organization. December.--pt. 3 Technical report. January.
Resumo:
Shipping list no.: 97-0225-P.