90 resultados para Groins (Shore protection)
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references (p. 34).
Resumo:
Maps have title: Report to Congress on the Coastal Barrier Resources System.
Resumo:
Mode of access: Internet.
Resumo:
"Filed pursuant to Section 5 of the Flood Control Act of 1945, 615 ILCS 15/5."
Resumo:
"Authority for the preparation of this report and state participation in the flood protection recommendations contained herein is provided by the Flood Control Act of 1945 [615 ILCS 15]."--Leaf 2.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
"Final Report for IDOT Project No.: WR-09118/SRA-190"
Resumo:
"Mantissa ... continens selectas quasdam constitutiones aggerales": 4 p. l., 136 p. at front.
Resumo:
"August 25, 1960."
Resumo:
Item 1045-A, 1045-B (microfiche).
Resumo:
Vol. 11 complete in one number
Resumo:
Mode of access: Internet.
Resumo:
Description based on: 1971.
Resumo:
"May 1981."