574 resultados para Congregational churches North Consociation of Litchfield County.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Issued August 1953" -- p. 1.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cover title: Professor Park's sermon on the duties of the New England clergy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Published by request."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The fellowship of the churches by Dr. Porter : p. [23]-27.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Buff printed paper cover. Printer's advertisement on back cover.