277 resultados para Exelon Braidwood Nuclear Facility (Will County, Ill.)
Resumo:
Since 1974, several reports have recommended modification to Busse Woods Reservoir's principal spillway to provide additional flood protection downstream. Consequently, DuPage County (Ill.) constructed several flood control structures as part of its Lower Salt Creek Watershed Plan, making modification of the Busse Woods Dam the last component of the plan to be implemented.
Resumo:
Includes an annoucement that the Illinois Dept. of Transportation, in cooperation with the Illinois State Toll Highway Authority, will be performing additional studies in support of the extension of I-355 through Will County, Illinois.
Resumo:
Photocopy of: Chicago : Cook County Department of Corrections Commission, 1965.
Resumo:
"ILENR/AE-92/02."
Resumo:
Lake Notes ... is a series of publications produced by the Illinois Environmental Protection Agency about issues confronting Illinois' lake resources. The objective of these publications is to provide lake and watershed residents with a greater understanding of environmental cause-and-effect relationships, and actions we all can take to protect our lakes.--p. [4].
Resumo:
Mode of access: Internet.
Resumo:
"This report was prepared under a contract with the Illinois Dept. of Nuclear Safety (IDNS) in support of the Illinois Low-Level Radioactive Waste Task Group. Numerous staff members of the Illinois State Geological Survey (ISGS) and the Illinois State Water Survey (ISWS) contributed to this report, which was compiled under the general administrative direction of Bill Shilts and Derek Winstanley, Chiefs of the ISGS and ISWS, respectively."--P. iv.
Resumo:
Mode of access: Internet.
Resumo:
At head of title: H.A.S.C. no. 100-85.
Resumo:
Mode of access: Internet.
Resumo:
Title from cover.
Resumo:
Mode of access: Internet.
Resumo:
"This fact sheet has been prepared pursuant to the requirements of Title 35 Illinois Administrative Code (35 IAC) Section 705.143. The fact sheet is intended to be a brief summary of the principal facts and significant factual, legal, methodological, and policy questions considered in preparing a draft Class 3 RCRA permit modification. This permit modification will allow the current permittee, Chevron Environmental Services Company (CESC), to establish an onsite Corrective Action Management Unit (CAMU) to manage remediation wastes generated during site remediation activities performed under the RCRA Corrective Action program and to establish a facility-wide Groundwater Management Zone (GMZ) for the duration of the corrective action work at the closed refinery. Pursuant to 35 IAC 705.143(a), this fact sheet is sent to the applicant, to the information repository and to any other person who requests it."
Resumo:
"NPDES permit number IL 0073253."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.