932 resultados para Cook County (Ill.). Dept. of Corrections.
Resumo:
"DOWR/SPS/91-001."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
"May 1929."
Resumo:
"November 1992."
Resumo:
"This report was financed in part by a grant from the U.S. Environmental Protection Agency under section 314 of the Clean Water Act."
Resumo:
Examines the financial status of the various public employee retirement systems in the Chicago, Cook County Area and the Illinois Municipal Retirement Fund (IMRF).
Resumo:
Lithographed; printed by the Peoria photopress.
Resumo:
"December 1975."
Resumo:
Prepared for the Auditor General to be presented to the Legislative Audit Commission and members of the General Assembly.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
At head of title: State of California, the Resources Agency of California, Dept. of Water Resources.
Resumo:
"July 1996"--T.p. verso.
Resumo:
"DOWR/SPR/95-002."
Resumo:
"December 1989."