22 resultados para NORTH KARELIA PROJECT
Resumo:
Available through DOCEX Project, Library of Congress.
Resumo:
The Illinois Department of Transportation (IDOT) has initiated the Illinois Route 2 Phase I Study. The study will examine the transportation needs of and solutions for the corridor through an extensive public involvement process. The study area is located in Winnebago County, extending approximately 2.0 miles from north of Auburn Street on the south to north of Riverside Blvd. on the north, all within the City of Rockford, Illinois.
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
Mode of access: Internet.
Resumo:
Cover title.
Resumo:
"April 24, 2006."
Resumo:
"Materials developed in connection with the Regional Land Tenure Research Project": p.133-136.