222 resultados para Water quality rate
Resumo:
"The Northeastern Illinois Planning Commission's Natural Resources Dept. conducted the lake assessment data collection effort for the six county northeastern Illinois region." -- P. iii.
Resumo:
"January 1995."
Resumo:
"Prepared for the Illinois Institute of Natural Resources and the Illinois Environmental Protection Agency"--Cover
Resumo:
"August, 1986."
Resumo:
"November 02, 1992."--Cover.
Resumo:
The establishment of a Total Maximum Daily Load sets the pollutant reduction goal necessary to improve impaired waters. It determines the load, or quantity of any given pollutant that can be allowed in a particular water body. A TDML must consider all potential sources of pollutants whether point or nonpoint. It also takes into account a margin of safety, which reflects scientific uncertainty, as well as the effects of seasonal variation.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.
Resumo:
Cover title: Water quality management planning.
Resumo:
Cover and spine title: Water quality management plan.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"IEPA/WPC/84-001."-- Cover.
Resumo:
"ILENR/RE-EA-89/07."
Resumo:
"Contract WR 22."
Resumo:
"IPEA/WPC/92-220"--Cover.