Problem of Hydroelectric Resources Management: Numerical Approach


Autoria(s): Bushenkov, V.A.; Ferreira, M.M.A.; Ribeiro, A.F.; Smirnov, G.V.
Data(s)

19/01/2017

19/01/2017

01/05/2016

Resumo

In this work we analyze an optimal control problem for a system of two hydroelectric power stations in cascade with reversible turbines. The objective is to optimize the profit of power production while respecting the system’s restrictions. Some of these restrictions translate into state constraints and the cost function is nonconvex. This increases the complexity of the optimal control problem. The problem is solved numerically and two different approaches are adopted. These approaches focus on global optimization techniques (Chen-Burer algorithm) and on a projection estimation refinement method (PERmethod). PERmethod is used as a technique to reduce the dimension of the problem. Results and execution time of the two procedures are compared.

Identificador

Bushenkov, V.A.,Ferreira, M.M.A., Ribeiro, A.F., Smirnov, G.V. Problem of Hydroelectric Resources Management: Numerical Approach,-Applied Mathematics & Information Sciences, Vol.10, No.3(May 2016), pp:823-831

1935-0090

http://www.naturalspublishing.com/files/published/352h0wyly365k1.pdf

http://hdl.handle.net/10174/19899

MAT

bushen@uevora.pt

nd

nd

nd

339

10.18576/amis/100302

Idioma(s)

eng

Publicador

Natural Sciences Publishing

Direitos

openAccess

Palavras-Chave #Optimal Control #Global Optimization #PER method #Chen-Burer algorithm
Tipo

article