A new methodology for generation investment in the national electricity market of Australia
Data(s) |
01/01/2006
|
---|---|
Resumo |
Market administrators hold the vital role of maintaining sufficient generation capacity in their respective electricity market. However without the jurisdiction to dictate the generator types, locations and timing of new generation, the reliability of the system may be compromised by delayed entry of new generation. This paper illustrates a new generation investment methodology that can effectively present expected returns from the pool market; while concurrently searching for the type and placement of a new generator to fulfil system reliability requirements. |
Identificador | |
Idioma(s) |
eng |
Publicador |
The Institution of Engineering and Technology Hong Kong |
Palavras-Chave | #E1 #290901 Electrical Engineering #660304 Energy systems analysis |
Tipo |
Conference Paper |