Flotation optimisation studies of the Perilya Broken Hill lead circuit


Autoria(s): Schwarz, S. E. E.; Kilgariff, B.
Contribuinte(s)

Graeme J. Jameson

Data(s)

01/01/2005

Identificador

http://espace.library.uq.edu.au/view/UQ:101768

Idioma(s)

eng

Publicador

Australasian Institute of Mining and Metallurgy (AusIMM)

Palavras-Chave #Flotation #Broken Hill #Perilya Broken Hill Mine #optimisation study #lead #zinc #E1 #290702 Mineral Processing #640300 First Stage Treatment of Ores and Minerals #0914 Resources Engineering and Extractive Metallurgy #091404 Mineral Processing/Beneficiation
Tipo

Conference Paper