Grade uncertainty in stope design: improving the optimisation process
Data(s) |
01/01/2004
|
---|---|
Identificador | |
Publicador |
The Australasian Institute of Mining and Metallurgy |
Palavras-Chave | #E1 #290701 Mining Engineering |
Tipo |
Conference Paper |