Design and installation, total energy plant-central equipment building, Summit Plaza Apartments : "Operation Breakthrough site", Jersey City, New Jersey /


Autoria(s): Gamze-Korobkin-Caloger.; United States. Division of Energy, Building Technology, and Standards.
Data(s)

31/12/1969

Resumo

"Previous edition current."

Prepared for U.S. Dept. of Housing and Urban Development, Office of Policy Development and Research, Division of Energy, Building Technology and Standards.

"November 1978"--p. [4] of cover.

On cover: HUDMIUS Modular Integrated Utility Systems.

At head of title: Final report.

Includes bibliographical references (p. 28)

Mode of access: Internet.

Formato

bib

bib

bib

bib

Identificador

http://hdl.handle.net/2027/mdp.39015038017474

http://hdl.handle.net/2027/mdp.39015007201273

http://hdl.handle.net/2027/uc1.b4154618

http://hdl.handle.net/2027/pur1.32754081252060

Idioma(s)

eng

Publicador

[Washington, D.C.?] : U.S. Dept. of Housing and Urban Development, Office of Policy Development and Research,

Direitos

Items in this record are available as Public Domain, Google-digitized. View access and use profile at http://www.hathitrust.org/access_use#pd-google. Please see individual items for rights and use statements.

Palavras-Chave #Total energy systems (On-site electric power production)
Tipo

text