Quality assurance representative's guide.


Autoria(s): United States. Army. Corps of Engineers.
Data(s)

31/12/1969

Resumo

"July 1997"--Vol. 5.

"August 1992"--Vol. 3.

"March 1992"--Vol. 2.

"January 1992"--Vol. 1.

Shipping list no.: 92-0236-P (v. 1); 92-0465-P (v. 2); 2001-0204-P (v. 3, 5).

"Supersedes volume 3, EP 415-1-261, 30 Dec 82"--Vol. 3, p. [i].

"Supersedes EP 415-1-261, May 1986"--Vol. 2, p. [1].

"Supersedes volume 1, EP 415-1-261, November 1981"--Vol. 1, p. i.

Cover title.

v. 1. General information and sitework -- v. 2. Pile driving, dams, levees and related items -- v. 3. Architectural and structural features in building construction -- v. 5. Ground water extraction, ground water treatment, landfills, soils vapor extraction, slurry walls and solidification/stabilization.

Mode of access: Internet.

Formato

bib

Identificador

http://hdl.handle.net/2027/uc1.b5159869

Idioma(s)

eng

Publicador

[Washington, D.C.] : US Army Corps of Engineers,

Direitos

Items in this record are available as Public Domain, Google-digitized. View access and use profile at http://www.hathitrust.org/access_use#pd-google. Please see individual items for rights and use statements.

Palavras-Chave #Quality assurance #Building inspection #Construction industry
Tipo

text