Dynamics interaction between rails and structure in a composite bridge of 120 m length
Data(s) |
2012
|
---|---|
Resumo |
Dynamics interaction between rails and structure in a composite bridge of 120 m length |
Formato |
application/pdf |
Identificador | |
Idioma(s) |
eng |
Publicador |
E.U.I.T. Obras Públicas (UPM) |
Relação |
http://oa.upm.es/22845/1/INVE_MEM_2012_153966.pdf info:eu-repo/semantics/altIdentifier/doi/null |
Direitos |
http://creativecommons.org/licenses/by-nc-nd/3.0/es/ info:eu-repo/semantics/openAccess |
Fonte |
6th Conference IABMAS on Bridge, Maintenace, Safety and Management (IABMAS 2012) | 6th Conference IABMAS on Bridge, Maintenace, Safety and Management (IABMAS 2012) | 08/07/2012 - 12/02/2014 | Stresa, Italy |
Palavras-Chave | #Ingeniería Civil y de la Construcción |
Tipo |
info:eu-repo/semantics/conferenceObject Ponencia en Congreso o Jornada PeerReviewed |