Risk/investment-driven transmission expansion planning with multiple scenarios


Autoria(s): Rahmani, Mohsen; Romero, Ruben A.; Rider, Marcos J.
Contribuinte(s)

Universidade Estadual Paulista (UNESP)

Data(s)

27/05/2014

27/05/2014

31/07/2013

Resumo

This study presents a new methodology based on risk/investment to solve transmission network expansion planning (TNEP) problem with multiple future scenarios. Three mathematical models related to TNEP problems considering multiple future generation and load scenarios are also presented. These models will provide planners with a meaningful risk assessment that enable them to determine the necessary funding for transmission lines at a permissible risk level. The results using test and real systems show that the proposed method presents better solutions compared with scenario analysis method. ©The Institution of Engineering and Technology 2013.

Formato

154-165

Identificador

http://dx.doi.org/10.1049/iet-gtd.2011.0742

IET Generation, Transmission and Distribution, v. 7, n. 2, p. 154-165, 2013.

1751-8687

http://hdl.handle.net/11449/76085

10.1049/iet-gtd.2011.0742

WOS:000321742700007

2-s2.0-84880694555

Idioma(s)

eng

Relação

IET Generation, Transmission and Distribution

Direitos

closedAccess

Palavras-Chave #Future generations #Real systems #Risk levels #Scenario analysis #Transmission expansion planning #Transmission network expansion planning #Mathematical models #Risk assessment
Tipo

info:eu-repo/semantics/article