Transmission system expansion planning by a branch-and-bound algorithm


Autoria(s): Rider, M. J.; Garcia, A. V.; Romero, R.
Contribuinte(s)

Universidade Estadual Paulista (UNESP)

Data(s)

20/05/2014

20/05/2014

01/01/2008

Resumo

A branch and bound (B& B) algorithm using the DC model, to solve the power system transmission expansion planning by incorporating the electrical losses in network modelling problem is presented. This is a mixed integer nonlinear programming (MINLP) problem, and in this approach, the so-called fathoming tests in the B&B algorithm were redefined and a nonlinear programming (NLP) problem is solved in each node of the B& B tree, using an interior-point method. Pseudocosts were used to manage the development of the B&B tree and to decrease its size and the processing time. There is no guarantee of convergence towards global optimisation for the MINLP problem. However, preliminary tests show that the algorithm easily converges towards the best-known solutions or to the optimal solutions for all the tested systems neglecting the electrical losses. When the electrical losses are taken into account, the solution obtained using the Garver system is better than the best one known in the literature.

Formato

90-99

Identificador

http://dx.doi.org/10.1049/iet-gtd:20070090

Iet Generation Transmission & Distribution. Hertford: Inst Engineering Technology-iet, v. 2, n. 1, p. 90-99, 2008.

1751-8687

http://hdl.handle.net/11449/40811

10.1049/iet-gtd:20070090

WOS:000252958100011

Idioma(s)

eng

Publicador

Inst Engineering Technology-iet

Relação

Iet Generation Transmission & Distribution

Direitos

closedAccess

Tipo

info:eu-repo/semantics/article