A greedy heuristic and simulated annealing approach for a bicriteria flowshop scheduling problem with precedence constraints - a practical manufacturing case
Data(s) |
01/01/2012
|
---|---|
Identificador | |
Idioma(s) |
eng |
Publicador |
Springer UK |
Relação |
http://dro.deakin.edu.au/eserv/DU:30044300/hanoun-greedyheuristic-2012.pdf http://dx.doi.org/10.1007/s00170-011-3650-6 |
Direitos |
2011, Springer-Verlag London Limited |
Palavras-Chave | #flowshop scheduling #lexicographical optimization #multicriteria scheduling #simulated annealing |
Tipo |
Journal Article |