There are reasons of necessity in bio-fuel use and bio-energy fast development. It includes the material about bio-energy technologies, applications and methods. There are basic thermodynamics and economic theories. The economic calculation presents the comparison between two combinations. There are boiler plant below 20 MW in combination with ablative pyrolysis plant for bio-oil production and CHP plant below 100 MW in combination with the RTP pyrolysis bio-oil production technology. It provides a material about wood chips and bio-oil characteristics and explains it nature, presents the situation around the bio-fuel market or bio-fuel trade. There is a description of pyrolysis technologies such as ablative and RTP. The liquid product of the pyrolysis processes is bio-oil. The bio-oil could be different even of the same production process, because of the raw material nature and characteristics. The calculation shows advantages and weaknesses of combinations and obtained a proof of suppositions. The next thing, proven by this work is the fact that to get more efficiency from energy project it is good possibility to built plants in combinations. |
Identificador |
http://www.doria.fi/handle/10024/69879 URN:NBN:fi-fe201105301641 |
Idioma(s) |
en |
Palavras-Chave | #biomass #pyrolysis #RTP technology #ablative technology #bio-oil #economics #profitability #efficiency |
Tipo |
Master's thesis Diplomityö |