Review of Inconsistencies Between SUDAS and Iowa DOT Specifications Phase II: Implementation of Recommendations into SUDAS Specifications, TR-565, Synopsis, 2008


Autoria(s): Desconhecido
Data(s)

01/04/2008

Resumo

The current version of the SUDAS Specifications will be revised to accommodate the DOT’s utilization of SUDAS. The revisions to the SUDAS Specifications will be based upon the recommendations from Phase 1. In some instances, the recommendations will require reorganization of portions of the SUDAS Specifications. Upon incorporation of the Phase 1 recommendations, each applicable Division of the SUDAS Specifications will be updated into the active-imperative style, utilizing the 3- part specification format currently utilized by SUDAS.

Formato

pdf

Identificador

http://publications.iowa.gov/20064/1/IADOT_tr_565synopsis_phase2_Review_Inconsistencies_Between_SUDAS_IA_DOT_Specifications_2008.pdf

(2008) Review of Inconsistencies Between SUDAS and Iowa DOT Specifications Phase II: Implementation of Recommendations into SUDAS Specifications, TR-565, Synopsis, 2008. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/20064/

Palavras-Chave #Transportation #Roads and highways #Research #Design and Construction
Tipo

Departmental Report

NonPeerReviewed