his paper proposes an optimisation-based method to calculate the critical slip (speed) of dynamic stability and critical clearing time (CCT) of a self-excited induction generator (SEIG). A simple case study using the Matlab/Simulink environment has been included to exemplify the optimisation method. Relationships between terminal voltage, critical slip and reactance of transmission line, CCT and inertial constant have been determined, based on which analysis of impact on relaying setting has been further conducted for another simulation case.

Identificador

http://pure.qub.ac.uk/portal/en/publications/calculation-of-critical-clearing-time-of-embedded-generation-for-relay-setting-based-on-optimisation-method(d6ef5054-c0d6-41eb-835c-24889fc9af1a).html

http://dx.doi.org/10.1049/cp:20080044

Idioma(s)

eng

Direitos

info:eu-repo/semantics/restrictedAccess

Fonte

Liang , W & Littler , T 2008 , Calculation of Critical Clearing Time of Embedded Generation for Relay Setting Based on Optimisation Method . in Proceedings of the 9th IET International Conference on Developments in Power System Protection (DPSP 2008) . pp. 246-251 , IET 9th International Conference on Developments in Power System Protection (DPSP 2008) , Glasgow , United Kingdom , 1-1 March . DOI: 10.1049/cp:20080044

Tipo

contributionToPeriodical