龙滩工程左岸边坡监测资料分析与稳定性评价研究
Contribuinte(s) |
刘大安 |
---|---|
Data(s) |
2004
|
Resumo |
On the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of B-zone of left bank slope are carried on. At the same time, based on the monitoring data analysis in conjunction with the predecessor's mechanics analysis results, the deformation state of B-zone of the left bank slope is discussed and its stability is synthetically evaluated. The detailed research contents and results are as following: According to the monitoring drill histogram analysis of Longtan engineering left bank slope, numerical simulation analysis and model experimentation analysis of bedded counter-inclined steep slope, a new type of toppling deformation and failure mode is proposed, that is "up-slope warping". Then the deformation and failure mode of bedded counter-inclined steep slope is summarized as "down-slope toppling" type, "up-slope warping" type and "complex fold" type. On the basis of synthetic space-time analysis to surface monitoring data and deep rock mass deformation monitoring data of B-zone of Longtan left bank slope;, we can get the conclusion that there exists potential instability rock mass over 520m altitude, especially over 560m altitude of slope B, and the rock mass of around strong-weathering line or creep rock mass breaking band controls the deformation of the whole slope. 1. According to the synthetic space-time analysis and influence factors analysis to the surface monitoring data of B-zone of Longtan left bank slope, a dynamical index, accumulative total acceleration index, which is used to analyze the influence factors of slope surface deformation, is raised. The principle and method of accumulative acceleration index are explained, and the index can be used for the influence factors analysis of the similar slope. 2. Summarize the results of geologic analysis, monitoring analysis and mechanics analysis, the following conclusion can be gotten: the stability of B-zone of the slope is basically good. However, on the condition of drainage and slope toe loading engineering, there is still some creep deformation in the rock mass over 520m altitude, especially over 560m altitude. So, better measures of the monitoring and timely maintenance of the drainage system are suggested in the paper. |
Identificador | |
Idioma(s) |
中文 |
Fonte |
龙滩工程左岸边坡监测资料分析与稳定性评价研究.刘艳辉[d].中国科学院地质与地球物理研究所,2004.20-25 |
Palavras-Chave | #龙滩工程 #监测资料分析 #稳定性评价 |
Tipo |
学位论文 |