水库建设选址方案的决策分析
Data(s) |
1991
|
---|---|
Resumo |
水库建设方案的评价,涉及投入和效益两方面。投入包括资金和工期等,称为“输入”:效益包括工农业用水增加、防洪能力强增等。称为“输出”。分析这种多输入,多输出的系统,应用数据包络分析方法是非常有效的。 The evalution of choosing a site for a reservoir is related to investment and benefit. The investment including the fund and construction time limit etc. is called "Input" and the benefit including the increse of the utility water for the industrial and agricultural production and the capability of flood control etc. is called "Output". Using the Data Envelopment Analysis (DEA) methed to analyse the multi-input and mulit-output system is very efficient. |
Identificador | |
Idioma(s) |
中文 |
Palavras-Chave | #数据包络分析 #投入 #效益 |
Tipo |
期刊论文 |