achieving on-time delivery: a two-stage probabilistic scheduling strategy for software projects
Data(s) |
26/05/2010
|
---|---|
Identificador | |
Idioma(s) |
英语 |
Fonte |
Xiao Liu; Yun Yang; Jinjun Chen; Qing Wang; Li Mingshu.achieving on-time delivery: a two-stage probabilistic scheduling strategy for software projects.见:.,,,317-329 |
Tipo |
会议论文 |