Power-optimal scheduling for a green base station with delay constraints


Autoria(s): Lalitha, Anusha; Mondal, Santanu; Kumar, Satya; Sharma, Vinod
Data(s)

2013

Resumo

We consider a power optimization problem with average delay constraint on the downlink of a Green Base-station. A Green Base-station is powered by both renewable energy such as solar or wind energy as well as conventional sources like diesel generators or the power grid. We try to minimize the energy drawn from conventional energy sources and utilize the harvested energy to the maximum extent. Each user also has an average delay constraint for its data. The optimal action consists of scheduling the users and allocating the optimal transmission rate for the chosen user. In this paper, we formulate the problem as a Markov Decision Problem and show the existence of a stationary average-cost optimal policy. We also derive some structural results for the optimal policy.

Formato

application/pdf

Identificador

http://eprints.iisc.ernet.in/46927/1/Nati_Conf_Comm_1_2013.pdf

Lalitha, Anusha and Mondal, Santanu and Kumar, Satya and Sharma, Vinod (2013) Power-optimal scheduling for a green base station with delay constraints. In: 2013 National Conference on Communications (NCC), 15-17 Feb. 2013, New Delhi, India.

Publicador

IEEE

Relação

http://dx.doi.org/10.1109/NCC.2013.6488018

http://eprints.iisc.ernet.in/46927/

Palavras-Chave #Electrical Communication Engineering
Tipo

Conference Paper

PeerReviewed