Cost Effective Inspection and Maintenance Strategies for Earthing System in High Voltage (HV) Installations to Achieve a Safe and Reliable Power Supply
Contribuinte(s) |
Kumar, U Parida, A Rao, R |
---|---|
Data(s) |
2006
|
Identificador | |
Publicador |
Lulea University Press |
Relação |
Chattopadhyay, Gopi & Khera, Bipin (2006) Cost Effective Inspection and Maintenance Strategies for Earthing System in High Voltage (HV) Installations to Achieve a Safe and Reliable Power Supply. In Kumar, U, Parida, A, & Rao, R (Eds.) Condition Monitoring and Diagnostic Engineering Management: Proceedings of the 19th International Congress, 12 - 15 June 2006, Sweden, Lulea. |
Fonte |
Faculty of Built Environment and Engineering; School of Engineering Systems |
Palavras-Chave | #010112 Topology #010303 Optimisation #091399 Mechanical Engineering not elsewhere classified #High Voltage Installations, Earthing System, Inspection and Maintenence, Reliability |
Tipo |
Conference Paper |