362 resultados para contractor


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nonlinearity, uncertainty and subjectivity are the three predominant characteristics of contractors prequalification which cause the process more of an art than a scientific evaluation. A fuzzy neural network (FNN) model, amalgamating both the fuzzy set and neural network theories, has been developed aiming to improve the objectiveness of contractor prequalification. Through the FNN theory, the fuzzy rules as used by the prequalifiers can be identified and the corresponding membership functions can be transformed. Eighty-five cases with detailed decision criteria and rules for prequalifying Hong Kong civil engineering contractors were collected. These cases were used for training (calibrating) and testing the FNN model. The performance of the FNN model was compared with the original results produced by the prequalifiers and those generated by the general feedforward neural network (GFNN, i.e. a crisp neural network) approach. Contractor’s ranking orders, the model efficiency (R2) and the mean absolute percentage error (MAPE) were examined during the testing phase. These results indicate the applicability of the neural network approach for contractor prequalification and the benefits of the FNN model over the GFNN model. The FNN is a practical approach for modelling contractor prequalification.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The selection criteria for contractor pre-qualification are characterized by the co-existence of both quantitative and qualitative data. The qualitative data is non-linear, uncertain and imprecise. An ideal decision support system for contractor pre-qualification should have the ability of handling both quantitative and qualitative data, and of mapping the complicated nonlinear relationship of the selection criteria, such that rational and consistent decisions can be made. In this research paper, an artificial neural network model was developed to assist public clients identifying suitable contractors for tendering. The pre-qualification criteria (variables) were identified for the model. One hundred and twelve real pre-qualification cases were collected from civil engineering projects in Hong Kong, and eighty-eight hypothetical pre-qualification cases were also generated according to the “If-then” rules used by professionals in the pre-qualification process. The results of the analysis totally comply with current practice (public developers in Hong Kong). Each pre-qualification case consisted of input ratings for candidate contractors’ attributes and their corresponding pre-qualification decisions. The training of the neural network model was accomplished by using the developed program, in which a conjugate gradient descent algorithm was incorporated for improving the learning performance of the network. Cross-validation was applied to estimate the generalization errors based on the “re-sampling” of training pairs. The case studies show that the artificial neural network model is suitable for mapping the complicated nonlinear relationship between contractors’ attributes and their corresponding pre-qualification (disqualification) decisions. The artificial neural network model can be concluded as an ideal alternative for performing the contractor pre-qualification task.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Case note of Leighton Contractors Pty Ltd v Fox (2009) 258 ALR 673 ----- In Leighton Contractors Pty Ltd v Fox (2009) 83 ALJR 1086 ; 258 ALR 673 the High Court considered the liability of a principal contractor for the negligence of independent subcontractors on a building site. In its decision, the court considered the nature and the scope of the duty owed by principals to independent contractors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The extent of poor project outcomes is a recurring issue for construction industries worldwide. One of the main causes of these and project failure seems to be the inability of contractors to provide a high level of service quality to the project team. In Malaysia, design failures have also been identified as a further contributory factor. To overcome this, different types of subjective performance measurement have been progressively developed. These approaches are typically concerned with client satisfaction, customer satisfaction, home buyer satisfaction and occupant satisfaction, but very seldom consider contractor satisfaction. This paper examines the implications of this, and what is involved in developing satisfaction measures based on contractor perception instead of the typical sole concern with client performance. As a result, other attributes such as participants’ performance, business performance, project performance, external factors and contractor characteristics are also examined. Several potential attributes are derived from interviews among Malaysian contractors, namely: performance (direct attributes) and contractor characteristics (indirect attributes) that possibly influence contractor satisfaction levels. These attributes are then developed to improve the existing conceptual framework. The developed framework is expected to help the project team in performing projects more efficiently, maintaining service quality and improving relationships between participants. In addition, the findings of the paper should assist contractors enhance competitiveness, improve their image and create more job opportunities in the future.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A general mistrust within the contactor and subcontractor companies has identified one of the significant barriers to derive benefits from true downstream supply chain integration. Using the general theory of trust in inter-organizational relations and conducting interviews, this research discusses factors that influence development of trust and cooperation in contractor– subcontractor relationships in construction projects. System dynamics is the simulation method is selected in this theory-building effort, based on qualitative data collected from two projects of a construction company in Thailand. Performance, permeability and system based trust are found to make significant contributions toward parties’ trust level. Three strategic policies such as best value contracting, management of subcontractors as internal team and semi project partnering approach are recommended to stimulate the trust factors as well as cooperative long term relationship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Participant performance is critical to the success of projects. At the same time, enhancing the satisfaction of participants not only helps in problem solving but also improves their motivation and cooperation. However, previous research related to participant satisfaction is primarily concerned with clients and customers and relatively little attention has been paid to contractors. This paper investigates how the performance of project participants affects contractor project satisfaction in terms of the client's clarity of objectives (OC) and promptness of payments (PP), designer carefulness (DC), construction risk management (RM), the effectiveness their contribution (EW) and mutual respect and trust (RT). With 125 valid responses from contractors in Malaysia, a contractor satisfaction model is developed based on structural equation modelling. The results demonstrate the necessity for dividing abstract satisfaction into two dimensions, comprising economic-related satisfaction (ES) and production-related satisfaction (PS), with DC, OC, PP and RM having significant effects on ES, while DC, OC, EW and RM influence PS. In addition, the model tests the indirect effects of these performance variables on ES and PS. In particular, OC indirectly affects ES and PS through mediation of RM and DC respectively. The results also provide opportunities for improving contractor satisfaction and supplementing the contractor selection criteria for clients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Performance in the construction industry is increasingly scrutinized as a result of the delays, cost overruns and poor quality of the industry’s products and services. Increasingly, disputes, conflicts and mismatches of objectives among participants are contributory factors. Performance measurement approaches have been developed to overcome these problems. However, these approaches focus primarily on objective measures to the exclusion of subjective measures, particularly those concerning contractor satisfaction (Co-S). The contractor satisfaction model (CoSMo) developed here is intended to rectify the situation. Data derived from a questionnaire survey of 75 large contractors in Malaysia in respect of a key project are analysed to identify participant factors and their strength of relationship with Co-S dimensions. The results are presented in the form of eight regression equations. The outcome is a tool for use by project participants to provide a better understanding of how they, and the project, affect contractor satisfaction. The developed model sheds some light on a hitherto unknown aspect of construction management in providing an increased awareness of the importance of major Malaysian construction contractors’ needs in the execution of successful projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) is regarded as an effective means of delivering high performance green buildings, and the selection of DB contractors is of critical importance. The objective of this study is to evaluate the selection of design-builders for public buildings seeking Leadership in Energy and Environmental Design (LEED) certification and compare the selection practices involved with those of non-LEED-seeking DB projects through a robust content analysis of 74 DB request for proposals (RFPs) for public DB projects. The results of the content analysis reveal that the level of LEED certification is the dominant means of conveying the sustainability requirements in RFPs for contractor selection, with the majority of RFPs (60%) including sustainability requirements as part of the contractor evaluation package. With the exception of contractors' past performance, there is no statistically significant difference in the importance weightings of selection criteria between LEED-seeking and non-LEED-seeking buildings, and DB owners tend to place more emphasis on innovative technical solutions rather than the past performance of DB contractors. Additionally, the research findings also indicate that owners of LEED-seeking building projects tend to provide less design decisions in RFPs in order to solicit innovative design alternatives from potential DB contractors. This study provides DB owners with a number of practical implications for selecting appropriate design-builders for green DB projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is a framework to formalise contractors process for bidding decision making through categorising the factors effecting the decision to bid into five categories. It opens the door to introduce a strategic planning system for pre-contract and business development activities which cost the contractors up to 5% of the project cost which is considered as high risk investment and would have impact on submitted bid price and the project delivery quality.