988 resultados para TUNNEL EXCAVATION


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Context A definite cause of sarcoidosis has not been identified, however past research suggests that environmental factors may be triggers of the granulomatous response in genetically susceptible individuals. Case Presentation A 22-year-old male non-smoker, presented with progressive exertional dyspnea and cough of 3 months duration. One year before, when he started working in tunnel excavation, he had a normal chest radiograph. Chest imaging revealed bilateral nodules and masses of peribronchovascular distribution plus mediastinal lymphadenomegaly. Histologic lymph node analysis revealed non-caseating confluent granulomas. Sarcoidosis was diagnosed. The patient was treated with corticosteroids and advised to change jobs. Complete remission of the disease was achieved and persisted for at least one year without steroid treatment. Discussion Sarcoidosis is believed to have environmental triggers. The timing of the onset of sarcoidosis in this patient following intensive exposure to tunnel dust suggests an environmental contribution. The recognition that sarcoidosis may have occupational triggers have medical, employment, and legal implications. Am. J. Ind. Med. 55: 390-394, 2012. (C) 2011 Wiley Periodicals, Inc.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The assessment of settlement induced damage on buildings during the preliminary phase of tunnel excavation projects, is nowadays receiving greater attention. Analyses at different levels of detail are performed on the surface building in proximity to the tunnel, to evaluate the risk of structural damage and the need of mitigation measures. In this paper, the possibility to define a correlation between the main parameters that influence the structural response to settlement and the potential damage is investigated through numerical analysis. The adopted 3D finite element model allows to take into account important features that are neglected in more simplified approaches, like the soil-structure interaction, the nonlinear behaviour of the building, the three dimensional effect of the tunnelling induced settlement trough and the influence of openings in the structure. Aim of this approach is the development of an improved classification system taking into account the intrinsic vulnerability of the structure, which could have a relevant effect on the final damage assessment. Parametric analyses are performed, focusing on the effect of the orientation and the position of the structure with respect to the tunnel. The obtained results in terms of damage are compared with the Building Risk Assessment (BRA) procedure. This method was developed by Geodata Engineering (GDE) on the basis of empirical observations and building monitoring and applied during the construction of different metro lines in urban environment. The comparison shows a substantial agreement between the two procedures on the influence of the analysed parameters. The finite element analyses suggest a refinement of the BRA procedure for pure sagging conditions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Tunnel construction planning requires careful consideration of the spoil management part, as this involves environmental, economic and legal requirements. In this paper a methodological approach that considers the interaction between technical and geological factors in determining the features of the resulting muck is proposed. This gives indications about the required treatments as well as laboratory and field characterisation tests to be performed to assess muck recovery alternatives. While this reuse is an opportunity for excavations in good quality homogeneous grounds (e.g. granitic mass), it is critical for complex formation. This approach has been validated, at present, for three different geo-materials resulting from a tunnel excavation carried out with a large diameter Earth Pressure Balance Shield (EPB) through a complex geological succession. Physical parameters and technological features of the three materials have been assessed, according to their valorisation potential, for defining re-utilisation patterns. The methodology proved to be effective and the laboratory tests carried out on the three materials allowed the suitability and treatment effectiveness for each muck recovery strategy to be defined. © 2014 Elsevier Ltd.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Following a tunnel excavation in low-permeability soil, it is commonly observed that the ground surface continues to settle and ground loading on the tunnel lining changes, as the pore pressures in the ground approach a new equilibrium condition. The monitored ground response following the tunnelling under St James's Park, London, shows that the mechanism of subsurface deformation is composed of three different zones: swelling, consolidation and rigid body movement. The swelling took place in a confined zone above the tunnel crown, extending vertically to approximately 5 m above it. On the sides of the tunnel, the consolidation of the soil occurred in the zone primarily within the tunnel horizon, from the shoulder to just beneath the invert, and extending laterally to a large offset from the tunnel centreline. Above these swelling and consolidation zones the soil moved downward as a rigid body. In this study, soil-fluid coupled three-dimensional finite element analyses were performed to simulate the mechanism of long-term ground response monitored at St James's Park. An advanced critical state soil model, which can simulate the behaviour of London Clay in both drained and undrained conditions, was adopted for the analyses. The analysis results are discussed and compared with the field monitoring data. It is found that the observed mechanism of long-term subsurface ground and tunnel lining response at St James's Park can be simulated accurately only when stiffness anisotropy, the variation of permeability between different units within the London Clay and non-uniform drainage conditions for the tunnel lining are considered. This has important implications for future prediction of the long-term behaviour of tunnels in clays.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A case study of the response of two buildings to the construction of a 12 m diameter tunnel excavated by conventional method, in Italy, is studied. The 12 m diameter tunnel was constructed carrying out reinforcement of the tunnel face and around the crown prior to excavation and installation of the temporary sprayed concrete lining and the permanent reinforced concrete lining. Reflective prisms, placed at first floor level around the perimeter of the building facades, allowed building settlements to be measured. Ground settlements between the two buildings were measured using BRE type settlement studs. Extensive protective measures were adopted to maintain stability of the tunnel excavation and to reduce ground movements. The number of horizontal jet grout columns installed into the tunnel face was reduced over the course of the project. Results from CPT tests indicate that the undrained shear strength at the tunnel axis is around 120 kPa. SPT and undrained unconsolidated (UU) triaxial tests indicate lower strengths of around 80 kPa, although this may be due to sample disturbance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este trabalho apresenta um uso da geofísica aplicada em uma situação de ambiente urbano. O objetivo dos levantamentos foi o de delimitar a extensão da zona afetada por um colapso e desmoronamento do teto de um túnel em construção sob o Parque do Ibirapuera na capital paulista. São descritos e apresentados os resultados obtidos através do emprego dos métodos geofísicos geoelétricos e suas técnicas, em uma situação emergencial e de risco em uma área urbana na cidade de São Paulo. Também são comparadas as técnicas/arranjos de campo e a forma de apresentação e interpretação dos mesmos. Os métodos empregados foram a Eletrorresistividade, Polarização Induzida (IP) e Potencial Espontâneo (SP). Os trabalhos de campo e interpretação preliminar foram efetuados em apwenas um fim de semana (sábado e domingo). Os resultados mostraram-se plenamente satisfatórios e possibilitaram significativa redução nos custos nas obras de remediação da área do incidente, cuja área decresceu da inicialmente estimada pela engenharia (20x20 m) para 3x5 m definida pelos estudos geofísicos.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El presente documento presenta la definición de las obras e instalaciones necesarias para dar cobertura a unos niveles de producción de material de excavación proveniente del túnel del Espiño, para lo cual se decide construir el Vertedero del Espiño. Dicho vertedero cumple con la normativa ambiental, una vez finalizadas las actividades dentro del túnel el vertedero se clausura, sella y recupera medioambientalmente la zona afectada. Para ello se incluyen todos los documentos necesarios para la definición, justificación y valoración de las obras. This paper presents the definition of works and facilities needed to cover production levels of material from tunnel excavation Espiño, for which it is decided to build the weir Espiño. This landfill complies with environmental regulations, once finalized the activities inside the tunnel the landfill closes, environmentally sealed and recovers the affected area. To do all the necessary documents for the definition, justification and evaluation of the works included

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The twin-tunnel construction of the Jubilee Line Extension tunnels beneath St James's Park was simulated using coupled-consolidation finite-element analyses. The effect of defining different permeabilities for the final consolidation stage was investigated, and the performance of a fissure softening model was also evaluated. The analyses suggested an unexpectedly high permeability anisotropy for soil around the tunnel crown, possibly due to stress-induced permeability changes, or low-permeability laminations. Also, the permeability profile and lining conductivity were found to differ between the tunnels. Inclusion of the fissure model gave a narrower settlement trough, more alike that in the field, by preferentially softening simple shear behaviour. Long-term settlements at the site continue to increase at an unexpectedly high rate, suggesting the possibility of creep or unexpected soil softening during excavation. © 2012 Taylor & Francis Group.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes part of the monitoring undertaken at Abbey Mills shaft F, one of the main shafts of Thames Water's Lee tunnel project in London, UK. This shaft, with an external diameter of 30 m and 73 m deep, is one of the largest ever constructed in the UK and consequently penetrates layered and challenging ground conditions (Terrace Gravel, London Clay, Lambeth Group, Thanet Sand Formation, Chalk Formation). Three out of the twenty 1-2 m thick and 84 m deep diaphragm wall panels were equipped with fibre optic instrumentation. Bending and circumferential hoop strains were measured using Brillouin optical time-domain reflectometry and analysis technologies. These measurements showed that the overall radial movement of the wall was very small. Prior to excavation during a dewatering trial, the shaft may have experienced three-dimensional deformation due to differential water pressures. During excavation, the measured hoop and bending strains of the wall in the chalk exceeded the predictions. This appears to be related to the verticality tolerances of the diaphragm wall and lower circumferential hoop stiffness of the diaphragm walls at deep depths. The findings from this case study provide valuable information for future deep shafts in London. © ICE Publishing: All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The rapid industrial development and disorganized population growth in huge cities bring about various urban problems due to intense use of physical space on and below the surface. Subsurface problems in metropolitan areas are caused by subway line construction, which often follows the routes of utility networks, such as electric and telephone cables, water and gas pipes, storm sewers, etc. Usually, the main problems are related to damage or destruction of preexisting utilities, often putting human lives at risk. With the purpose of minimizing risks. GPR-profiling with 200 MHz antennae was done at two sites, both located in downtown Sao Paulo, Brazil. The objectives of this work were to map utilities or existing infrastructure in the subsurface in order to orient the construction of the Line 4 (yellow) subway tunnel in Sao Paulo. GPR profiles can detect water pipes, utility networks in the subsurface, and concrete foundation columns or pilings in subsoil up to 2 m depth. In addition. the GPR profiles also provided details of the target shapes in the subsurface. GPR interpretations combined with lithological information from boreholes and trenches opened in the study areas were extremely important in mapping of the correct spatial distribution of buried utilities at these two sites in Sao Paulo. This information improves and updates maps of utility placement, serves as a basis for planning of the geotechnical excavation of the Line 4 (yellow) subway tunnel in Sao Paulo, helps minimize problems related to destruction of preexisting utilities in the subsoil, and avoids risk of dangerous accidents. (C) 2012 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Far-field stresses are those present in a volume of rock prior to excavations being created. Estimates of the orientation and magnitude of far-field stresses, often used in mine design, are generally obtained by single-point measurements of stress, or large-scale, regional trends. Point measurements can be a poor representation of far-field stresses as a result of excavation-induced stresses and geological structures. For these reasons, far-field stress estimates can be associated with high levels of uncertainty. The purpose of this thesis is to investigate the practical feasibility, applications, and limitations of calibrating far-field stress estimates through tunnel deformation measurements captured using LiDAR imaging. A method that estimates the orientation and magnitude of excavation-induced principal stress changes through back-analysis of deformation measurements from LiDAR imaged tunnels was developed and tested using synthetic data. If excavation-induced stress change orientations and magnitudes can be accurately estimated, they can be used in the calibration of far-field stress input to numerical models. LiDAR point clouds have been proven to have a number of underground applications, thus it is desired to explore their use in numerical model calibration. The back-analysis method is founded on the superposition of stresses and requires a two-dimensional numerical model of the deforming tunnel. Principal stress changes of known orientation and magnitude are applied to the model to create calibration curves. Estimation can then be performed by minimizing squared differences between the measured tunnel and sets of calibration curve deformations. In addition to the back-analysis estimation method, a procedure consisting of previously existing techniques to measure tunnel deformation using LiDAR imaging was documented. Under ideal conditions, the back-analysis method estimated principal stress change orientations within ±5° and magnitudes within ±2 MPa. Results were comparable for four different tunnel profile shapes. Preliminary testing using plastic deformation, a rough tunnel profile, and profile occlusions suggests that the method can work under more realistic conditions. The results from this thesis set the groundwork for the continued development of a new, inexpensive, and efficient far-field stress estimate calibration method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

During the remediation of burial grounds at the US Department of Energy's (DOE's) Hanford Site in Washington State, the dispersion of contaminated soil particles and dust is an issue that is faced by site workers on a daily basis. This contamination problem is even more of a concern when one takes into account the semi-arid characteristics of the region where the site is located. To mitigate this problem, workers at the site use a variety of engineered methods to minimize the dispersion of contaminated soil and dust (i.e. use of water and/or suppression agents that stabilizes the soil prior to soil excavation, segregation, and removal activities). A primary contributor to the dispersion of contaminated soil and dust is wind soil erosion. The erosion process occurs when the wind speed exceeds a certain threshold value which depends on a number of factors including wind force loading, particle size, surface soil moisture, and the geometry of the soil. Thus under these circumstances, the mobility of contaminated soil and generation and dispersion of particulate matter are significantly influenced by these parameters. This dependence of soil and dust movement on threshold shear velocity, fixative dilution and/or application rates, soil moisture content, and soil geometry were studied for Hanford's sandy soil through a series of wind tunnel experiments, laboratory experiments and theoretical analysis. In addition, the behavior of plutonium (Pu) powder contamination in the soil was studied by introducing a Pu simulant (cerium oxide). The results showed that soil dispersion and PM10 concentrations decreased with increasing soil moisture. Also, it was shown that the mobility of the soil was affected by increasing wind velocity. It was demonstrated that the use of fixative products greatly decreased the amount of soil and PM10 concentrations when exposed to varying wind conditions. In addition, it was shown that geometry of the soil sample affected the velocity profile and calculation of roughness surface coefficient when comparing round and flat soil samples. Finally, threshold shear velocities were calculated for soil with flat surface and their dependency on surface soil moisture was demonstrated. A theoretical framework was developed to explain these dependencies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Far-field stresses are those present in a volume of rock prior to excavations being created. Estimates of the orientation and magnitude of far-field stresses, often used in mine design, are generally obtained by single-point measurements of stress, or large-scale, regional trends. Point measurements can be a poor representation of far-field stresses as a result of excavation-induced stresses and geological structures. For these reasons, far-field stress estimates can be associated with high levels of uncertainty. The purpose of this thesis is to investigate the practical feasibility, applications, and limitations of calibrating far-field stress estimates through tunnel deformation measurements captured using LiDAR imaging. A method that estimates the orientation and magnitude of excavation-induced principal stress changes through back-analysis of deformation measurements from LiDAR imaged tunnels was developed and tested using synthetic data. If excavation-induced stress change orientations and magnitudes can be accurately estimated, they can be used in the calibration of far-field stress input to numerical models. LiDAR point clouds have been proven to have a number of underground applications, thus it is desired to explore their use in numerical model calibration. The back-analysis method is founded on the superposition of stresses and requires a two-dimensional numerical model of the deforming tunnel. Principal stress changes of known orientation and magnitude are applied to the model to create calibration curves. Estimation can then be performed by minimizing squared differences between the measured tunnel and sets of calibration curve deformations. In addition to the back-analysis estimation method, a procedure consisting of previously existing techniques to measure tunnel deformation using LiDAR imaging was documented. Under ideal conditions, the back-analysis method estimated principal stress change orientations within ±5° and magnitudes within ±2 MPa. Results were comparable for four different tunnel profile shapes. Preliminary testing using plastic deformation, a rough tunnel profile, and profile occlusions suggests that the method can work under more realistic conditions. The results from this thesis set the groundwork for the continued development of a new, inexpensive, and efficient far-field stress estimate calibration method.