895 resultados para Subestação de energia elétrica


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Virtual Reality techniques applied in Electricity Environments provide a new supervisory control paradigm. The fact of existing a virtual environment (VE), geometrically similar to a real substation, reduces the difference of mental models built by field operators compared with those built by system center operation improving the communication. Beside this, those systems can be used as visualization interfaces for electricity system simulators, training systems for professors and undergraduate students, field operators and maintenance professionals. However, the development process of these systems is quite complex, combining several activities such as implementation, 3D modeling, virtual sceneries construction, usability assessment and management project techniques. In this context, this work present a GUI strategy to build field arrangements based on scene graphs, to reduce time in Virtual Electricity Substations Arrangement development. Through this, mistakes during the VE building can be avoided making this process more reliable. As an concept proof, all toolkits developed in this work were applied in the virtualization of the substations from a Brazilian power concessionary named CEMIG.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most algorithms for state estimation based on the classical model are just adequate for use in transmission networks. Few algorithms were developed specifically for distribution systems, probably because of the little amount of data available in real time. Most overhead feeders possess just current and voltage measurements at the middle voltage bus-bar at the substation. In this way, classical algorithms are of difficult implementation, even considering off-line acquired data as pseudo-measurements. However, the necessity of automating the operation of distribution networks, mainly in regard to the selectivity of protection systems, as well to implement possibilities of load transfer maneuvers, is changing the network planning policy. In this way, some equipments incorporating telemetry and command modules have been installed in order to improve operational features, and so increasing the amount of measurement data available in real-time in the System Operation Center (SOC). This encourages the development of a state estimator model, involving real-time information and pseudo-measurements of loads, that are built from typical power factors and utilization factors (demand factors) of distribution transformers. This work reports about the development of a new state estimation method, specific for radial distribution systems. The main algorithm of the method is based on the power summation load flow. The estimation is carried out piecewise, section by section of the feeder, going from the substation to the terminal nodes. For each section, a measurement model is built, resulting in a nonlinear overdetermined equations set, whose solution is achieved by the Gaussian normal equation. The estimated variables of a section are used as pseudo-measurements for the next section. In general, a measurement set for a generic section consists of pseudo-measurements of power flows and nodal voltages obtained from the previous section or measurements in real-time, if they exist -, besides pseudomeasurements of injected powers for the power summations, whose functions are the load flow equations, assuming that the network can be represented by its single-phase equivalent. The great advantage of the algorithm is its simplicity and low computational effort. Moreover, the algorithm is very efficient, in regard to the accuracy of the estimated values. Besides the power summation state estimator, this work shows how other algorithms could be adapted to provide state estimation of middle voltage substations and networks, namely Schweppes method and an algorithm based on current proportionality, that is usually adopted for network planning tasks. Both estimators were implemented not only as alternatives for the proposed method, but also looking for getting results that give support for its validation. Once in most cases no power measurement is performed at beginning of the feeder and this is required for implementing the power summation estimations method, a new algorithm for estimating the network variables at the middle voltage bus-bar was also developed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The reconfiguration of a distribution network is a change in its topology, aiming to provide specific operation conditions of the network, by changing the status of its switches. It can be performed regardless of any system anomaly. The service restoration is a particular case of reconfiguration and should be performed whenever there is a network failure or whenever one or more sections of a feeder have been taken out of service for maintenance. In such cases, loads that are supplied through lines sections that are downstream of portions removed for maintenance may be supplied by the closing of switches to the others feeders. By classical methods of reconfiguration, several switches may be required beyond those used to perform the restoration service. This includes switching feeders in the same substation or for substations that do not have any direct connection to the faulted feeder. These operations can cause discomfort, losses and dissatisfaction among consumers, as well as a negative reputation for the energy company. The purpose of this thesis is to develop a heuristic for reconfiguration of a distribution network, upon the occurrence of a failure in this network, making the switching only for feeders directly involved in this specific failed segment, considering that the switching applied is related exclusively to the isolation of failed sections and bars, as well as to supply electricity to the islands generated by the condition, with significant reduction in the number of applications of load flows, due to the use of sensitivity parameters for determining voltages and currents estimated on bars and lines of the feeders directly involved with that failed segment. A comparison between this process and classical methods is performed for different test networks from the literature about networks reconfiguration

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O trabalho em questão apresenta uma proposta do suprimento de energia elétrica de um alimentador de distribuição pela operação isolada de uma usina geradora de energia elétrica que utiliza como fonte primária a energia calorífica da incineração de resíduos sólidos urbanos. O suprimento proposto é sugerido após a constatação do esgotamento da capacidade da subestação supridora desse alimentador. O esgotamento é verificado a partir de simulações realizadas no sistema de distribuição real da Rede Celpa, localizado na região Nordeste do Estado do Pará, o qual atende os municípios Santa Izabel do Pará, Santo Antonio do Tauá, Colares, Vigia e São Caetano de Odivelas. Nas simulações é utilizado um programa de fluxo de carga desenvolvido especificamente para os sistemas radias de distribuição e da subtransmissão. A proposta de suprimento via geração de energia elétrica através da incineração dos resíduos sólidos urbanos se dá a partir do confronto entre as alternativas de expansão (a alternativa técnica normalmente praticada pela concessionária) e a alternativa técnica-econômica-ambiental sugerida neste trabalho que demonstra as vantagens econômicas, sociais e ambientais da proposta.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Electrical energy is present in the lives of all people and is extremely important that it be delivered to end users with plenty of quality, safety and low costs. The electric power substations are responsible for transmission and distribution of electricity generating sources to consumers, and with technological advances and the subsequent automation of same, the electricity began to be delivered with greater continuity and reliability. Protection systems in substations are largely responsible for making the electricity reaches the final consumer with quality, since their function is to prevent the spread of any type of failure occurred at any point of transmission to the load centers. These systems consist primarily by the current transformers and potential, by the protective relays and circuit breakers and switchgear. The processors send the necessary data to the relays and, if those detect any abnormality in the system, operate the opening command of the branch circuit breakers to isolate where the fault. Therefore, it is essential to better understand the operation of such equipment, as well as the overall system. This work aims to study the main substation equipment, current transformers and potential and, especially, protection relays, in order to obtain the advantages that automated systems can provide

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the topics required for the selection of surge arresters used, the output of autotransformers, which protect the system Auxiliary Services (SE) of an electrical substation. Surge arresters used are part of the Protection System Lightning (SPDA). Transmission lines mostly run through regions with orographic well diversified and have constant weather changes, which lead to many undesirable interactions with electromagnetic phenomena, such as giving rise to blackout on 10 November 2009, which left nine states without power, which led to unplanned shutdowns in the system that left millions of people without electricity. This work of completion is to determine whether the method used in the selection of surge arresters meet the protection needs faced by a substation auxiliary services, through the use of software use ATPDraw

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Consultoria Legislativa - Área XII - Recursos Minerais, Hídricos e Energéticos.