758 resultados para SCHEDULES


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The scheduling of locomotive movements on cane railways has proven to be a very complex task. Various optimisation methods have been used over the years to try and produce an optimised schedule that eliminates or minimises bin supply delays to harvesters and the factory, while minimising the number of locomotives, locomotive shifts and cane bins, and also the cane age. This paper reports on a new attempt to develop an automatic scheduler using a mathematical model solved using mixed integer programming and constraint programming approaches and blocking parallel job shop scheduling fundamentals. The model solution has been explored using conventional constraint programming search techniques and found to produce a reasonable schedule for small-scale problems with up to nine harvesters. While more effort is required to complete the development of the full model with metaheuristic search techniques, the work completed to date gives confidence that the metaheuristic techniques will provide near optimal solutions in reasonable time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper addresses the problem of scheduling a cane transport system involving both rail transport and road transport, where the road transport operates from several sidings in the rail network. An iterative approach for scheduling the rail transport system has been developed using existing rail transport scheduling tools. The assumption that harvesters serviced by road transport are effectively operating from the rail siding from which their bins are supplied seems a reasonable starting point for the analysis. There is a need to manually modify the schedule to take into account the road transport schedule to ensure that full bins are not collected before the road transport system delivers them back to the rail siding.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Thalidomide is an anti-angiogenic agent currently used to treat patients with malignant cachexia or multiple myeloma. Lenalidomide (CC-5013) is an immunomodulatory thalidomide analogue licensed in the United States of America (USA) for the treatment of a subtype of myelodysplastic syndrome. This two-centre, open-label phase I study evaluated dose-limiting toxicities in 55 patients with malignant solid tumours refractory to standard chemotherapies. Lenalidomide capsules were consumed once daily for 12 weeks according to one of the following three schedules: (I) 25 mg daily for the first 7 d, the daily dose increased by 25 mg each week up to a maximum daily dose of 150 mg; (II) 25 mg daily for 21 d followed by a 7-d rest period, the 4-week cycle repeated for 3 cycles; (III) 10 mg daily continuously. Twenty-six patients completed the study period. Two patients experienced a grade 3 hypersensitivity rash. Four patients in cohort I and 4 patients in cohort II suffered grade 3 or 4 neutropaenia. In 2 patients with predisposing medical factors, grade 3 cardiac dysrhythmia was recorded. Grade 1 neurotoxicity was detected in 6 patients. One complete and two partial radiological responses were measured by computed tomography scanning; 8 patients had stable disease after 12 weeks of treatment. Fifteen patients remained on treatment as named patients; 1 with metastatic melanoma remains in clinical remission 3.5 years from trial entry. This study indicates the tolerability and potential clinical efficacy of lenalidomide in patients with advanced solid tumours who have previously received multi-modality treatment. Depending on the extent of myelosuppressive pre-treatment, dose schedules (II) or (III) are advocated for large-scale trials of long-term administration. © 2006 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis presents a multi-criteria optimisation study of group replacement schedules for water pipelines, which is a capital-intensive and service critical decision. A new mathematical model was developed, which minimises total replacement costs while maintaining a satisfactory level of services. The research outcomes are expected to enrich the body of knowledge of multi-criteria decision optimisation, where group scheduling is required. The model has the potential to optimise replacement planning for other types of linear asset networks resulting in bottom-line benefits for end users and communities. The results of a real case study show that the new model can effectively reduced the total costs and service interruptions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article an alternate sensitivity analysis is proposed for train schedules. It characterises the schedules robustness or lack thereof and provides unique profiles of performance for different sources of delay and for different values of delay. An approach like this is necessary because train schedules are only a prediction of what will actually happen. They can perform poorly with respect to a variety of performance metrics, when deviations and other delays occur, if for instance they can even be implemented, and as originally intended. The information provided by this analytical approach is beneficial because it can be used as part of a proactive scheduling approach to alter a schedule in advance or to identify suitable courses of action for specific “bad behaviour”. Furthermore this information may be used to quantify the cost of delay. The effect of sectional running time (SRT) deviations and additional dwell time in particular were quantified for three railway schedule performance measures. The key features of this approach were demonstrated in a case study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research utilised software developed for managing the Australian sugar industry's cane rail transport operations and GPS data used to track locomotives to ensure safe operation of the railway system to improve transport operations. As a result, time usage in the sugarcane railway can now be summarised and locomotive arrival time to sidings and mills can be predicted. This information will help the development of more efficient run schedules and enable mill staff and harvesters to better plan their shifts ahead, enabling cost reductions through better use of available time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Resource assignment and scheduling is a difficult task when job processing times are stochastic, and resources are to be used for both known and unknown demand. To operate effectively within such an environment, several novel strategies are investigated. The first focuses upon the creation of a robust schedule, and utilises the concept of strategically placed idle time (i.e. buffering). The second approach introduces the idea of maintaining a number of free resources at each time, and culminates in another form of strategically placed buffering. The attraction of these approaches is that they are easy to grasp conceptually, and mimic what practitioners already do in practice. Our extensive numerical testing has shown that these techniques ensure more prompt job processing, and reduced job cancellations and waiting time. They are effective in the considered setting and could easily be adapted for many real life problems, for instance those in health care. This article has more importantly demonstrated that integrating the two approaches is a better strategy and will provide an effective stochastic scheduling approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Drying regrowth native hardwoods to satisfactory moisture levels is a significant challenge for the processing industry. Dried quality is becoming increasingly important as sawn hardwood continues to move away from structural markets into appearance applications, but more difficult to achieve as the resource mix being processed becomes younger. An accurate, predictive drying model is a powerful tool in schedule development, decreasing the reliance on expensive, repetitive drying trials. This project updates the KilnSched drying model to allow the drying behaviour of regrowth blackbutt, jarrah, messmate, spotted gum and Victorian ash to be modeled more accurately. The effect of high temperature drying and humidity treatments on spotted gum were also investigated, as was the economics of various drying methods on spotted gum and blackbutt.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The responses of the field mouse Mus booduga to shifts in schedules of LD cycles were monitored and the results were interpreted with the help of a PRC constructed for the same species. The results reveal that, M. booduga reentrained faster with a lesser number of transients after delay shifts than advance shifts, thus exhibiting “asymmetry effect.” A positive correlation was observed between the number of transients and the number of hours of shift. In most of the shifts, the sign of the transients (negative for delaying transients and positive for advancing transients) coincided with the direction of the shift. Interestingly, 11 and 12 h of advance shifting resulted in delaying transients. An 11-h advance shift can also be interpreted as a 13-h delay. Reentrainment through delaying transients is faster as compared to reentrainment through advancing transients. Thus, this animal might have taken a “shorter route,” as proved by the fact that an 11-h advance shift has evoked delaying transients. But a 13-h advance shift evoked only advancing transients. This prompts us to speculate that there may be a “phase jump” in M. booduga. Further, irrespective of whether L or D has been doubled in a 12-h shift, both evoked only delaying transients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some interesting ideas on improving the cost-effectiveness of feeding in semi-intensive finfish aquaculture are presented.