979 resultados para Production plan and control


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With global markets and global competition, pressures are placed on manufacturing organizations to compress order fulfillment times, meet delivery commitments consistently and also maintain efficiency in operations to address cost issues. This chapter argues for a process perspective on planning, scheduling and control that integrates organizational planning structures, information systems as well as human decision makers. The chapter begins with a reconsideration of the gap between theory and practice, in particular for classical scheduling theory and hierarchical production planning and control. A number of the key studies of industrial practice are then described and their implications noted. A recent model of scheduling practice derived from a detailed study of real businesses is described. Socio-technical concepts are then introduced and their implications for the design and management of planning, scheduling and control systems are discussed. The implications of adopting a process perspective are noted along with insights from knowledge management. An overview is presented of a methodology for the (re-)design of planning, scheduling and control systems that integrates organizational, system and human perspectives. The most important messages from the chapter are then summarized.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is an analysis of the case law of the European Court of Human Rights on the obligation on States to plan and control the use of potentially lethal force by their police and military personnel. It illustrates the Court's attachment to the strict or careful scrutiny test and suggests how the Court might want to develop its jurisprudence in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Prior to the development of a production standard control system for ML Aviation's plan-symmetric remotely piloted helicopter system, SPRITE, optimum solutions to technical requirements had yet to be found for some aspects of the work. This thesis describes an industrial project where solutions to real problems have been provided within strict timescale constraints. Use has been made of published material wherever appropriate, new solutions have been contributed where none existed previously. A lack of clearly defined user requirements from potential Remotely Piloted Air Vehicle (RPAV) system users is identified, A simulation package is defined to enable the RPAV designer to progress with air vehicle and control system design, development and evaluation studies and to assist the user to investigate his applications. The theoretical basis of this simulation package is developed including Co-axial Contra-rotating Twin Rotor (CCTR), six degrees of freedom motion, fuselage aerodynamics and sensor and control system models. A compatible system of equations is derived for modelling a miniature plan-symmetric helicopter. Rigorous searches revealed a lack of CCTR models, based on closed form expressions to obviate integration along the rotor blade, for stabilisation and navigation studies through simulation. An economic CCTR simulation model is developed and validated by comparison with published work and practical tests. Confusion in published work between attitude and Euler angles is clarified. The implementation of package is discussed. dynamic adjustment of assessment. the theory into a high integrity software Use is made of a novel technique basing the integration time step size on error Simulation output for control system stability verification, cross coupling of motion between control channels and air vehicle response to demands and horizontal wind gusts studies are presented. Contra-Rotating Twin Rotor Flight Control System Remotely Piloted Plan-Symmetric Helicopter Simulation Six Degrees of Freedom Motion ( i i)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Listeria monocytogenes is the causative agent of the severe foodborne infection listeriosis. The number of listeriosis cases in recent years has increased in many European countries, including Finland. Contamination of the pathogen needs to be minimized and growth to high numbers in foods prevented in order to reduce the incidence of human cases. The aim of this study was to evaluate contamination routes of L. monocytogenes in the food chain and to investigate methods for control of the pathogen in food processing. L. monocytogenes was commonly found in wild birds, the pig production chain and in pork production plants. It was found most frequently in birds feeding at landfill site, organic farms, tonsil samples, and sites associated with brining. L. monococytogenes in birds, farms, food processing plant or foods did not form distinct genetic groups, but populations overlapped. The majority of genotypes recovered from birds were also detected in foods, food processing environments and other animal species and birds may disseminate L. monocytogenes into food chain. Similar genotypes were found in different pigs on the same farm, as well as in pigs on farms and later in the slaughterhouse. L. monocytogenes contamination spreads at farm level and may be a contamination source into slaughterhouses and further into meat. Incoming raw pork in the processing plant was frequently contaminated with L. monocytogenes and genotypes in raw meat were also found in processing environment and in RTE products. Thus, raw material seems to be a considerable source of contamination into processing facilities. In the pork processing plant, the prevalence of L. monocytogenes increased in the brining area, showing that the brining was an important contamination site. Recovery of the inoculated L. monocytogenes strains showed that there were strain-specific differences in the ability to survive in lettuce and dry sausage. The ability of some L. monocytogenes strains to survive well in food production raises a challenge for industry, because these strains can be especially difficult to remove from the products and raises a need to use an appropriate hurdle concept to control most resistant strains. Control of L. monocytogenes can be implemented throughout the food chain. Farm-specific factors affected the prevalence of L. monocytogenes and good farm-level practices can therefore be utilized to reduce the prevalence of this pathogen on the farm and possibly further in the food chain. Well separated areas in a pork production plant had low prevalences of L. monocytogenes, thus showing that compartmentalization controls the pathogen in the processing line. The food processing plant, especially the brining area, should be subjected to disassembling, extensive cleaning and disinfection to eliminate persistent contamination by L. monocytogenes, and replacing brining with dry-salting should be considered. All of the evaluated washing solutions decreased the populations of L. monocytogenes on precut lettuce, but did not eliminate the pathogen. Thus, the safety of fresh-cut produce cannot rely on washing with disinfectants, and high-quality raw material and good manufacturing practices remain important. L. monocytogenes was detected in higher levels in sausages without the protective culture than in sausages with this protective strain, although numbers of L. monocytogenes by the end of the ripening decreased to the level of < 100 MPN/g in all sausages. Protective starter cultures provide an appealing hurdle in dry sausage processing and assist in the control of L. monocytogenes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Gill-netting and rotenoning have been used for assessing and monitoring fish stock abundance in Volta Lake. The lake and the main gear types used on it have been described. Before a gill-net sampling plan was set up, a preliminary survey was undertaken which largely determined the final form of the plan. An investigation as to whether or not the lake was being overfished concluded that it was being underfished. Commercial and experimental catch data analyses disclosed that the adults of the small species were being little utilized. Commercial sized species were also not being harvested according to their apparent proportion in the population. Production is presently fluctuating between approximately 37,000 and 40,000 tonnes. A high correlation between commercial and experimental catch was realized. Developments which have followed in the wake of stock assessment and monitoring studies include: introduction of monofilament nylon net, development of a special scoop net to permit mass harvest of clupeids after they have been attracted to light, and the design of a larger canoe which would help to extend the fishery into open water. New regulation and management policies will have to be formulated in the light of new findings before a rational exploitation of all the species can be achieved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.