979 resultados para Predator Pit


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Several mechanisms for self-enhancing feedback instabilities in marine ecosystems are identified and briefly elaborated. It appears that adverse phases of operation may be abruptly triggered by explosive breakouts in abundance of one or more previously suppressed populations. Moreover, an evident capacity of marine organisms to accomplish extensive geographic habitat expansions may expand and perpetuate a breakout event. This set of conceptual elements provides a framework for interpretation of a sequence of events that has occurred in the Northern Benguela Current Large Marine Ecosystem (off south-western Africa). This history can illustrate how multiple feedback loops might interact with one another in unanticipated and quite malignant ways, leading not only to collapse of customary resource stocks but also to degradation of the ecosystem to such an extent that disruption of customary goods and services may go beyond fisheries alone to adversely affect other major global ecosystem concerns (e.g. proliferations of jellyfish and other slimy, stingy, toxic and/or noxious organisms, perhaps even climate change itself, etc.). The wisdom of management interventions designed to interrupt an adverse mode of feedback operation is pondered. Research pathways are proposed that may lead to improved insights needed: (i) to avoid potential 'triggers' that might set adverse phases of feedback loop operation into motion; and (ii) to diagnose and properly evaluate plausible actions to reverse adverse phases of feedback operation that might already have been set in motion. These pathways include the drawing of inferences from available 'quasi-experiments' produced either by short-term climatic variation or inadvertently in the course of biased exploitation practices, and inter-regional applications of the comparative method of science.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

High temperature superconductor precursor billets (feed rods) have been developed for loading into silver tubes. The billets are loaded prior to rolling or drawing operations in PIT wire manufacture. Investigations have shown that wires and tapes prepared from feed rod loaded tubes show enhanced uniformity of electrical transport properties when compared with conventional powder packing, especially in wires drawn to long lengths. Analysis on production feed rods have shown carbon content to be as low as 110 ppm. © 1999 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Outbreaks of the coral-killing seastar Acanthaster planci are intense disturbances that can decimate coral reefs. These events consist of the emergence of large swarms of the predatory seastar that feed on reef-building corals, often leading to widespread devastation of coral populations. While cyclic occurrences of such outbreaks are reported from many tropical reefs throughout the Indo-Pacific, their causes are hotly debated, and the spatio-temporal dynamics of the outbreaks and impacts to reef communities remain unclear. Based on observations of a recent event around the island of Moorea, French Polynesia, we show that Acanthaster outbreaks are methodic, slow-paced, and diffusive biological disturbances. Acanthaster outbreaks on insular reef systems like Moorea's appear to originate from restricted areas confined to the ocean-exposed base of reefs. Elevated Acanthaster densities then progressively spread to adjacent and shallower locations by migrations of seastars in aggregative waves that eventually affect the entire reef system. The directional migration across reefs appears to be a search for prey as reef portions affected by dense seastar aggregations are rapidly depleted of living corals and subsequently left behind. Coral decline on impacted reefs occurs by the sequential consumption of species in the order of Acanthaster feeding preferences. Acanthaster outbreaks thus result in predictable alteration of the coral community structure. The outbreak we report here is among the most intense and devastating ever reported. Using a hierarchical, multi-scale approach, we also show how sessile benthic communities and resident coral-feeding fish assemblages were subsequently affected by the decline of corals. By elucidating the processes involved in an Acanthaster outbreak, our study contributes to comprehending this widespread disturbance and should thus benefit targeted management actions for coral reef ecosystems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lack of water can be the least of a farmer’s worries in times of drought. Predatory banks can be just as deadly to a farmer’s livelihood. Former Queensland farmer and grazier Lynton Freeman has become increasingly anxious about the financial tightrope being walked by Australian farmers as the record floods of 2011 have given way in only three years to savage drought. He fears for hundreds of family farmers at risk — not from lack of water, but from lack of knowledge in how to manage their businesses through the drought and keep their heads above the financial water that will threaten many before this drought breaks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective To assess the usability and validity of the Primary Care Practice Improvement Tool (PC-PIT), a practice performance improvement tool based on 13 key elements identified by a systematic review. It was co-created with a range of partners and designed specifically for primary health care. Design This pilot study examined the PC-PIT using a formative assessment framework and mixed-methods research design. Setting and participants Six high-functioning general practices in Queensland, Australia, between February and July 2013. A total of 28 staff participated — 10 general practitioners, six practice or community nurses, 12 administrators (four practice managers; one business manager and eight reception or general administrative staff). Main outcome measures Readability, content validity and staff perceptions of the PC-PIT. Results The PC-PIT offers an appropriate and acceptable approach to internal quality improvement in general practice. Quantitative assessment scores and qualitative data from all staff identified two areas in which the PC-PIT required modification: a reduction in the indicative reading age, and simplification of governance-related terms and concepts. Conclusion The PC-PIT provides an innovative approach to address the complexity of organisational improvement in general practice and primary health care. This initial validation will be used to develop a suite of supporting, high-quality and free-to-access resources to enhance the use of the PC-PIT in general practice. Based on these findings, a national trial is now underway.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A solo exhibition by Joseph Breikers included in the MetroArts 2011 galleries Program. The exhbition comprised a series of predominantly sculptural works that reflected the artists ongoing interest in medieval, gothic and death metal visual motifs. The exhibition thus acted as a ironic meditation on ritual, belonging and cultural identity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Critical stage in open-pit mining is to determine the optimal extraction sequence of blocks, which has significant impacts on mining profitability. In this paper, a more comprehensive block sequencing optimisation model is developed for the open-pit mines. In the model, material characteristics of blocks, grade control, excavator and block sequencing are investigated and integrated to maximise the short-term benefit of mining. Several case studies are modeled and solved by CPLEX MIP and CP engines. Numerical investigations are presented to illustrate and validate the proposed methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.

Relevância:

20.00% 20.00%

Publicador: