935 resultados para Post-tensioned prestressed concrete construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Abstract is not available.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of the multiple Fourier method to analyses the stress distribution in the and regions of as a post-tensioned prestressed concrete beam had shown. The multiple Fourier method demonstrated have is a relatively new method for solving those problems for which the “Saint Vansant principle” is not applicable, The actual three-dimensional problem and a two-dimensional simplified representation of it are treated. The two-dimensional case is treated first and rather completely to gain further experience with multiple Fourier procedure, the appropriate Galerkin Vector for the three-dimensional case is found and the required relations between the arbitrary functions are stated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multi-level concrete buildings requrre substantial temporary formwork structures to support the slabs during construction. The primary function of this formwork is to safely disperse the applied loads so that the slab being constructed, or the portion of the permanent structure already constructed, is not overloaded. Multi-level formwork is a procedure in which a limited number of formwork and shoring sets are cycled up the building as construction progresses. In this process, each new slab is supported by a number of lower level slabs. The new slab load is, essentially, distributed to these supporting slabs in direct proportion to their relative stiffness. When a slab is post-tensioned using draped tendons, slab lift occurs as a portion of the slab self-weight is balanced. The formwork and shores supporting that slab are unloaded by an amount equivalent to the load balanced by the post-tensioning. This produces a load distribution inherently different from that of a conventionally reinforced slab. Through , theoretical modelling and extensive on-site shore load measurement, this research examines the effects of post-tensioning on multilevel formwork load distribution. The research demonstrates that the load distribution process for post-tensioned slabs allows for improvements to current construction practice. These enhancements include a shortening of the construction period; an improvement in the safety of multi-level form work operations; and a reduction in the quantity of form work materials required for a project. These enhancements are achieved through the general improvement in safety offered by post-tensioning during the various formwork operations. The research demonstrates that there is generally a significant improvement in the factors of safety over those for conventionally reinforced slabs. This improvement in the factor of safety occurs at all stages of the multi-level formwork operation. The general improvement in the factors of safety with post-tensioned slabs allows for a shortening of the slab construction cycle time. Further, the low level of load redistribution that occurs during the stripping operations makes post-tensioned slabs ideally suited to reshoring procedures. Provided the overall number of interconnected levels remains unaltered, it is possible to increase the number of reshored levels while reducing the number of undisturbed shoring levels without altering the factors of safety, thereby, reducing the overall quantity of formwork and shoring materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"July 1994."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"November 1996."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article examines the effectiveness of two innovative retrofitting solutions at enhancing the seismic behaviour of a substandard reinforced concrete building tested on a shake table as part of the Pan-European funded project BANDIT. To simulate typical substandard construction, the reinforcement of columns and beam-column joints of the full-scale structure had inadequate detailing. An initial series of shake table tests were carried out to assess the seismic behaviour of the bare building and the effectiveness of a first retrofitting intervention using Post-Tensioned Metal Straps. After these tests, columns and joints were repaired and subsequently retrofitted using a retrofitting solution consisting of Carbon Fibre Reinforced Polymers and Post-Tensioned Metal Straps applied on opposite frames of the building. The building was then subjected to unidirectional and three-dimensional incremental seismic excitations to assess the effectiveness of the two retrofitting solutions at improving the global and local building performance. The article provides details of the above shake table testing programme and retrofitting solutions, and discusses the test results in terms of the observed damage, global damage indexes, performance levels and local strains. It is shown that whilst the original bare building was significantly damaged at a peak ground acceleration (PGA) of 0.15g, the retrofitted building resisted severe threedimensional shake table tests up to PGA=0.60g without failure. Moreover, the retrofitting intervention enhanced the interstorey drift ratio capacity of the 1st and 2nd floors by 160% and 110%, respectively. Therefore, the proposed dual retrofitting system is proven to be very effective for improving the seismic performance of substandard buildings.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The effectiveness of a novel Post-Tensioned Metal Strapping (PTMS) technique at enhancing the seismic behaviour of a substandard RC building was investigated through full-scale shake-table tests during the EU-funded project BANDIT. The building had inadequate reinforcement detailing in columns and joints to replicate old construction practices. After the bare building was initially damaged significantly, it was repaired and strengthened with PTMS to perform additional seismic tests. The PTMS technique improved considerably the seismic performance of the tested building. Whilst the bare building experienced critical damage at an earthquake of PGA=0.15g, the PTMS-strengthened building sustained a PGA=0.35g earthquake without compromising stability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Construction contractors and facility managers are being challenged to minimize the carbon footprint. Life cycle carbon‐equivalent (CO2‐e) accounting, whereby the potential emissions of greenhouse gases due to energy expenditure during construction and subsequent occupation of built infrastructure, generally ceases at the end of the service life. However, following demolition, recycling of demolition waste that becomes incorporated into 2nd generation construction is seldom considered within the management of the carbon footprint. This paper aims to focus on built concrete infrastructure, particularly the ability of recycled concrete to chemically react with airborne CO2, thereby significantly influencing CO2‐e estimates.

Design/methodology/approach – CO2‐e estimates were made in accordance with the methodology outlined in the Australian National Greenhouse Accounts (NGA) Factors and were based on the energy expended for each life cycle activity from audited records. Offsets to the CO2‐e estimates were based on the documented ability of concrete to chemically react with airborne carbon dioxide (“carbonation”) and predictions of CO2 uptake by concrete and recycled concrete was made using existing predictive diffusion models. The author's study focused on a built concrete bridge which was demolished and recycled at the end of the service life, and the recycled concrete was utilized towards 2nd generation construction. The sensitivity of CO2‐e and carbonation estimates were tested on several different types of source demolition waste as well as subsequent construction applications using recycled concrete (RCA). Whole‐of‐life CO2‐e estimates, including carbonation of RCA over the 1st and 2nd generations, were estimated and contrasted with conventional carbon footprints that end at the conclusion of the 1st generation.

Findings – Following demolition, CO2 capture by RCA is significant due to the more permeable nature of the crushed RCA compared with the original built infrastructure. RCA also has considerably greater exposed surface area, relative to volume, than a built concrete structure, and therefore more highly exposed surface to react with CO2: it therefore carbonates more comprehensively. CO2‐e estimates can be offset by as much as 55‐65 per cent when including the contribution of carbonation of RCA built within 2nd generation infrastructure. Further offsets are achievable using blended fly ash or slag cement binders; however, this study has focused on concrete composed of 100 per cent OPC binders and the effects of RCA.

Originality/value – Construction project estimates of life cycle CO2‐e emissions should include 2nd generation applications that follow the demolition of the 1st generation infrastructure. Life cycle estimates generally end at the time of demolition. However, by incorporating the recycled concrete demolition waste into the construction of 2nd generation infrastructure, the estimated CO2‐e is significantly offset during the 2nd generation life cycle by chemical uptake of CO2 (carbonation). This paper provides an approach towards inclusion of 2nd generation construction applications into whole‐of‐life estimates of CO2‐e.