993 resultados para Fastmap db


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Hemoglobinopathies were included in the Brazilian Neonatal Screening Program on June 6, 2001. Automated high-performance liquid chromatography (HPLC) was indicated as one of the diagnostic methods. The amount of information generated by these systems is immense, and the behavior of groups cannot always be observed in individual analyses. Three-dimensional (3-D) visualization techniques can be applied to extract this information, for extracting patterns, trends or relations from the results stored in databases. We applied the 3-D visualization tool to analyze patterns in the results of hemoglobinopathy based on neonatal diagnosis by HPLC. The laboratory results of 2520 newborn analyses carried out in 2001 and 2002 were used. The Fast, F1, F and A peaks, which were detected by the analytical system, were chosen as attributes for mapping. To establish a behavior pattern, the results were classified into groups according to hemoglobin phenotype: normal (N = 2169), variant (N = 73) and thalassemia (N = 279). 3-D visualization was made with the FastMap DB tool; there were two distribution patterns in the normal group, due to variation in the amplitude of the values obtained by HPLC for the F1 window. It allowed separation of the samples with normal Hb from those with alpha thalassemia, based on a significant difference (P > 0.05) between the mean values of the Fast and A peaks, demonstrating the need for better evaluation of chromatograms; this method could be used to help diagnose alpha thalassemia in newborns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We present WebGeSTer DB, the largest database of intrinsic transcription terminators (http://pallab.serc.iisc.ernet.in/gester). The database comprises of a million terminators identified in 1060 bacterial genome sequences and 798 plasmids. Users can obtain both graphic and tabular results on putative terminators based on default or user-defined parameters. The results are arranged in different tiers to facilitate retrieval, as per the specific requirements. An interactive map has been incorporated to visualize the distribution of terminators across the whole genome. Analysis of the results, both at the whole-genome level and with respect to terminators downstream of specific genes, offers insight into the prevalence of canonical and non-canonical terminators across different phyla. The data in the database reinforce the paradigm that intrinsic termination is a conserved and efficient regulatory mechanism in bacteria. Our database is freely accessible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The output spectrum of Yb-doped double-clad fiber superfluorescent source (SFS) is tailored by placing a broadband dichroic mirror in the pump end of conventional single-pass forward configuration, which constitutes double-pass forward configuration. The 3 dB bandwidth is increased from I I to 42 nm. A maximum output SFS power of 2.12 W and a slope efficiency of 43.2% are obtained. The double-clad fiber is 25 in and the pump power is adequate to saturate the fiber as far as the feedback-induced lasing appears. (c) 2004 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

下载PDF阅读器目的:研究重组人胰岛素样生长因子1(rhIGF-1)对近似于人类2型糖尿病的db/db小鼠的降血糖作用.方法:正常饲养db/db及同品系的正常小鼠,定期监测血糖和血胰岛素水平.待db/db小鼠表现出明显的高血糖及高胰岛素血症后随机分为4组,每日皮下注射溶媒、胰岛素或不同剂量的rhlGF-1,共2周.首次给药后每30min测定血糖1次,观测不同干预方式的即时降糖效果.再于每次给药前测定血糖,观察2周内的变化趋势.结果:db/db小鼠饲养至8周龄时表现出明显的血糖升高及高胰岛素血症.所用剂量的胰岛素对db/db小鼠未表现出明显的降血糖作用;rhIGF-1特别是高剂量rhIGF-1即时及短期降糖效果均较明显,可有效保护db/db小鼠.结论:rhIGF-1对db/db小鼠有较好的降血糖作用,对伴有明显胰岛素抵抗的糖尿病患者具有临床应用前景.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We report the operation of a gigahertz clocked quantum key distribution system featuring high composable and quantifiable security while maintaining more than 1 Mbit/s secure key rate over a 50 km quantum channel. © OSA 2013.