965 resultados para Design Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Even following the advent of BIM, we continue to move from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behaviour-related issues which impact the adoption and utilization of new technologies. The fragmented and dispersed nature of the AEC sector, and the huge number of small organizations that comprise it, are a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK’s transport infrastructure is one of the most heavily used in the world. The performance of these networks is critically dependent on the performance of cutting and embankment slopes which make up £20B of the £60B asset value of major highway infrastructure alone. The rail network in particular is also one of the oldest in the world: many of these slopes are suffering high incidents of instability (increasing with time). This paper describes the development of a fundamental understanding of earthwork material and system behaviour, through the systematic integration of research across a range of spatial and temporal scales. Spatially these range from microscopic studies of soil fabric, through elemental materials behaviour to whole slope modelling and monitoring and scaling up to transport networks. Temporally, historical and current weather event sequences are being used to understand and model soil deterioration processes, and climate change scenarios to examine their potential effects on slope performance in futures up to and including the 2080s. The outputs of this research are being mapped onto the different spatial and temporal scales of infrastructure slope asset management to inform the design of new slopes through to changing the way in which investment is made into aging assets. The aim ultimately is to help create a more reliable, cost effective, safer and more resilient transport system.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is widely being criticised as a fragmented industry. There are mounting calls for the industry to change. The espoused change calls for collaboration as well as embracing innovation in the process of design, construction and across the supply chain. Innovation and the application of emerging technologies are seen as enablers for integrating the processes ‘integrating the team’ such as building information modelling (BIM). A questionnaire survey was conducted to ascertain change in construction with regard to design management, innovation and the application of BIM as cutting edge pathways for collaboration. The respondents to the survey were from an array of designations across the construction industry such as construction managers, designers, engineers, design coordinators, design managers, architects, architectural technologists and surveyors. There was a general agreement by most respondents that the design team was responsible for design management in their organisation. There is a perception that the design manager and the client are the catalyst for advancing innovation. The current state of industry in terms of incorporating BIM technologies is posing a challenge as well as providing an opportunity for accomplishment. BIM technologies provide a new paradigm shift in the way buildings are designed, constructed and maintained. This paradigm shift calls for rethinking the curriculum for educating building professionals, collectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Degree Project is a cooperativ work with the advertising agency PAX in Falun and the industrial companyRemote Control, who constructs and sells actuators for the global market.The assignment concerns bringing out a graphic profile, or with another expression a Design Management, forRemote Control AB graphic materials. Remote Control AB has a quality certification ISO 9000 and is workingwith, when this report was wrote, an environment certification ISO 14001.The Company has been paid attention to Internet and other media.The supervisors are familiar to that Design Management is a soon coming competition element, like quality andenvironment management.This Degree project contains research, analysis and the construction of graphic material. The research has beencommitted most of the time to trace the customer, the market and the competitor, because its the most importantphase. It’s also important looking at competitor’s way of working with marketing management, so you can separatethem from the own company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To have an effective and efficient mechanism to store, manage and utilize software sources is essential to the automation of software engineering. The paper presents an innovative approach in managing software resources using software warehouse where software assets are systematically accumulated, deposited, retrieved, packaged, managed and utilized, driven by data-mining and OLAP technologies. The results lead to streamlined high efficient software development process and enhance the productivity in response to modern challenges of the design and development of software applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Presents a case study of design management within an Australian design-construct organization on a large residential apartment project, with the purpose of identifying and analysing issues associated with the organization, responsibilities and stages of development in a typical design-construct project. Discusses the nature of introspection in the Australian construction industry, the shift in procurement methods, the design and build approach, whole life issues, the need for a design manager, and the role of the facilities manager. Profiles the case study organization and its contracts and procurement methods, before focusing on weaknesses in the company, the role of the project design development manager in leading the design team, managing the design consultants, and interacting and advising the developer in relation to design decisions. Suggests from the exercise that: the project manager should remain the overall project leader, manager and interface between design, cost, programme, buildability, construction and user requirements; the design manager should be responsible for issuing all documentation; and the design cost manager should be responsible for verifying that the design developed accords with project budgets, project brief and quality requirements in conjunction with the design manager.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As clients have become more aware and demanding of the construction industry, they are also less tolerant of the management of its problems and the risks involved in the delivery of major projects. Identification and allocation of risk is one of the most critical processes in the early stages of project development. Often it is the deciding factor in the selection of the building process and of the type of procurement method adopted to manage the various project risks. The emergence of different forms of procurement, and in particular, design-construct and novation, requires the design construct contractor to not only accept the risks associated with the construction of the works, but also of the design management during the design development of the project. With the increasing requirement for design-construct contractors to balance the cost management issues and design development through the various stages, the role of the design manager as information manager has evolved and expanded in importance. This paper presents a case study of design management within a design-construct organization on a large residential apartment project. It identifies and analyses issues concerned with the organization, responsibilities, relationships and stages of development in a typical design-construct project.