976 resultados para Assembly line supply


Relevância:

80.00% 80.00%

Publicador:

Resumo:

A Guide to Office Clerical Time Standards is an instructional performance piece based on a corporate manual from 1960. The pamphlet is focused on the time necessary for the accomplishment of minute labour procedures in the office, from the depressing and releasing of typewriter keys to the opening and closing of filing cabinet drawers. In the performance, seven costumed performers represent the different levels of management and employment while performing the actions described in the guide, accompanied by a live musical score. There has been much discussion of the changes to work in the west following the decline of post-Fordist service sector jobs. These increasingly emphasise the specificity of employees’ knowledge and cognitive skill. However, this greater flexibility and creativity at work has been accompanied by an opposite trajectory. The proletarisation of white collar work has given rise to more bureaucracy, target assessment and control for workers in previously looser creative professions, from academia to the arts. The midcentury office is the meeting point of these cultures, where the assembly line efficiency management of the factory meets the quantifying control of the knowledge economy. A Guide to Office Clerical Time Standards explores the survival of one regime into its successor following the lines of combined and uneven development that have turned the emancipatory promise of immaterial labour into the perma-temp hell of the cognitariat. The movement is accompanied by a score of guitar, bass and drums, the componenets of the rock ‘n’ roll music that rose from the car factories of the motor city and the cotton fields of the southern states to represent the same junction of expression and control.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Product verifications have become a cost-intensive and time-consuming aspect of modern electronics production, but with the onset of an ever-increasing miniaturisation, these aspects will become even more cumbersome. One may also go as far as to point out that certain precision assembly, such as within the biomedical sector, is legally bound to have 0 defects within production. Since miniaturisation and precision assembly will soon become a part of almost any product, the verifications phases of assembly need to be optimised in both functionality and cost. Another aspect relates to the stability and robustness of processes, a pre-requisite for flexibility. Furthermore, as the re-engineering cycle becomes ever more important, all information gathered within the ongoing process becomes vital. In view of these points, product, or process verification may be assumed to be an important and integral part of precision assembly. In this paper, product verification is defined as the process of determining whether or not the products, at a given phase in the life-cycle, fulfil the established specifications. Since the product is given its final form and function in the assembly, the product verification normally takes place somewhere in the assembly line which is the focus for this paper.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The introduction of assembly line techniques to vehicle manufacturing by Henry Ford in the early 1900s dramatically reduced production costs, improved quality and made cars affordable to all. As a consequence people’s lives, cities and society were transformed.
Many attempts have been made to apply vehicle mass production techniques to domestic housing manufacturing, but the success has been limited largely due to underdeveloped manufacturing processes, incomplete integration of building services and limited consideration of environmental performance.
This paper describes an approach that promises to revolutionize the building market in Australia by providing architect designed attractive high quality comfortable modular housing system that incorporates state-of-the-art services and controls. Costs, GHG emissions and material wastage are all substantially less than timber framed housing construction commonly used in Australia.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The design and production process of the workshop shed made of bamboo presented in this paper is the result of almost two years of cooperation between Viverde Farmers Association, Universidade Estadual Paulista and Unisol. The system consists of rounded aroeira pillars, a roof structure formed by in natura bamboo frames and metal connections. The development of the parts and connections detailing, through the technical drawing of each component, enabled the development of standardized precision fittings aiming at optimizing the execution and saving time, energy and raw material on the assembly line. In this process, the creation and improvement of templates was necessary in order to facilitate the assembly of parts. The component assembly phases were recorded at the Experimental Laboratory for Bamboo and Wood Processing - UNESP/FEB. The results showed the good performance of the pre-fabrication process of bamboo components.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O presente trabalho visa realizar uma análise ergonômica em uma linha de produção. Através de pesquisas, análises de relatórios e procedimentos tornou-se possível chegar a conclusões que permitiram formular propostas que objetivam à redução do impacto do trabalho realizado na saúde do colaborador. Sendo assim, o objetivo principal desta pesquisa é analisar a situação ergonômica da linha de produção focalizando a biomecânica do trabalho. A justificativa é em virtude da grande evasão de colaboradores devido aos problemas de saúde relacionados a ergonomia, derivados dos principais problemas que enfrentam com o manuseio e movimentação de cargas pesadas, como a dor lombar, levando a apresentar problemas crônicos e agudos. O método utilizado consistiu, primeiramente, no levantamento de dados reais de produção na empresa, nos casos similares estudados em literatura e nos cálculos matemáticos que puderam comprovar as análises, observando-se que, apesar dos avanços da tecnologia e a mecanização das tarefas, muitas atividades continuam sendo realizadas manualmente. As conclusões obtidas deixam claros os cuidados que se devem ter com a saúde do colaborador através da implementação de ações que visem a melhoria da área de trabalho com equipamento adequado para a atividade a ser desempenhada, redundando em benefícios tanto para o empregado como para o próprio empregador.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This work was done a study to develop a model for definition of hours assembling planes, that were able to meet both the most complete plane, i.e. with the highest number of mounts but also that do not generate an idleness on the line when a plane less complex passing on the Assembly line. The proposed model has great advantages over the current model that the company has been using, as for example: leftover hand-to-hand for assembling airplanes only 10% than the current model raises and an expense to pay the human resource/time of only 6.7% compared with the current model at the company

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this article, we introduce two new variants of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) that allow parallelization of and collaboration between heterogeneous workers. These new approaches suppose an additional level of complexity in the Line Design and Assignment process, but also higher flexibility; which may be particularly useful in practical situations where the aim is to progressively integrate slow or limited workers in conventional assembly lines. We present linear models and heuristic procedures for these two new problems. Computational results show the efficiency of the proposed approaches and the efficacy of the studied layouts in different situations. (C) 2012 Elsevier B.V. All rights reserved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This work deals with the car sequencing (CS) problem, a combinatorial optimization problem for sequencing mixed-model assembly lines. The aim is to find a production sequence for different variants of a common base product, such that work overload of the respective line operators is avoided or minimized. The variants are distinguished by certain options (e.g., sun roof yes/no) and, therefore, require different processing times at the stations of the line. CS introduces a so-called sequencing rule H:N for each option, which restricts the occurrence of this option to at most H in any N consecutive variants. It seeks for a sequence that leads to no or a minimum number of sequencing rule violations. In this work, CS’ suitability for workload-oriented sequencing is analyzed. Therefore, its solution quality is compared in experiments to the related mixed-model sequencing problem. A new sequencing rule generation approach as well as a new lower bound for the problem are presented. Different exact and heuristic solution methods for CS are developed and their efficiency is shown in experiments. Furthermore, CS is adjusted and applied to a resequencing problem with pull-off tables.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The car sequencing problem determines sequences of different car models launched down a mixed-model assembly line. To avoid work overloads of workforce, car sequencing restricts the maximum occurrence of labor-intensive options, e.g., a sunroof, by applying sequencing rules. We consider this problem in a resequencing context, where a given number of buffers (denoted as pull-off tables) is available for rearranging a stirred sequence. The problem is formalized and suited solution procedures are developed. A lower bound and a dominance rule are introduced which both reduce the running time of our graph approach. Finally, a real-world resequencing setting is investigated.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La presente Tesis persigue la definición y el desarrollo de un sistema basado en el conocimiento que permita la generación de modelos de líneas de montaje durante la fase conceptual de definición de una aeroestructura aeronáutica. Para ello, se propone la definición de un modelo formal del proceso en concurrencia asociado al diseño de líneas de montaje en la fase conceptual, y de un modelo de la estructura de datos básica para soportar dicho proceso. Ambos modelos sirven de base para el desarrollo de una aplicación de prueba de concepto en el entorno del sistema comercial CAX-PLM CATIA v5. Los modelos de línea generados integran las tres estructuras básicas definidas en el modelo propuesto: producto, procesos y recursos. Los modelos generados son estructuras “de montaje”, basadas en estructuras de producto “de fabricación” a su vez derivadas de estructuras “de diseño”. Cada modelo generado se evalúa en términos de cuatro estimaciones básicas: dimensiones máximas del nodo producto, distancia de transporte y medio a utilizar, tiempo total de ejecución y coste total. La generación de modelos de línea de montaje se realiza en concurrencia con la función diseño de producto, teniendo por tanto la oportunidad de influir en la misma e incluir requerimientos de fabricación y montaje al producto en las primeras fases de su ciclo de vida, lo que proporciona una clara ventaja competitiva. El desarrollo propuesto en esta Tesis permite sentar las bases para realizar desarrollos con objeto de asistir a los diseñadores durante la fase conceptual de generación de diseños de líneas de montaje. La aplicación prototipo desarrollada demuestra la viabilidad de la propuesta conceptual que se realiza en la Tesis. ABSTRACT The current thesis proposes the definition and development of a knowledge-based system to generate aircraft components assembly line models during the conceptual phase of the product life cycle. With this objective, the definition of a formal activity model to represent the design of assembly lines during the conceptual phase is proposed; such model considers the concurrence with the product design process. Associated to the activity model, a data structure model is defined to support such process. Both models are the basis for the development of a proof of concept application within the environment of the commercial CAX-PLM system CATIA v5. The generated assembly line models integrate the three basic structures defined in the proposed model: product, processes and resources. The generated models are “As Prepared” structures based on “As Planned” structures derived from “As Designed” structures. Each generated model is evaluated in terms of four basic estimates: maximum dimensions of the product node, transport distance and transport mean to be used, total execution time and total cost. The assembly line models generation is made in concurrence with the product design function. Therefore, it provides the opportunity to influence on it and allows including manufacturing and assembly requirements early in the product life cycle, which gives a clear competitive advantage. The development proposed in this Thesis allows setting the foundation to carry out further developments with the aim of assisting designers during the conceptual phase of the assembly line design process. The developed prototype application shows the feasibility of the conceptual proposal presented in the Thesis.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

PURPOSE The decision-making process plays a key role in organizations. Every decision-making process produces a final choice that may or may not prompt action. Recurrently, decision makers find themselves in the dichotomous question of following a traditional sequence decision-making process where the output of a decision is used as the input of the next stage of the decision, or following a joint decision-making approach where several decisions are taken simultaneously. The implication of the decision-making process will impact different players of the organization. The choice of the decision- making approach becomes difficult to find, even with the current literature and practitioners’ knowledge. The pursuit of better ways for making decisions has been a common goal for academics and practitioners. Management scientists use different techniques and approaches to improve different types of decisions. The purpose of this decision is to use the available resources as well as possible (data and techniques) to achieve the objectives of the organization. The developing and applying of models and concepts may be helpful to solve managerial problems faced every day in different companies. As a result of this research different decision models are presented to contribute to the body of knowledge of management science. The first models are focused on the manufacturing industry and the second part of the models on the health care industry. Despite these models being case specific, they serve the purpose of exemplifying that different approaches to the problems and could provide interesting results. Unfortunately, there is no universal recipe that could be applied to all the problems. Furthermore, the same model could deliver good results with certain data and bad results for other data. A framework to analyse the data before selecting the model to be used is presented and tested in the models developed to exemplify the ideas. METHODOLOGY As the first step of the research a systematic literature review on the joint decision is presented, as are the different opinions and suggestions of different scholars. For the next stage of the thesis, the decision-making process of more than 50 companies was analysed in companies from different sectors in the production planning area at the Job Shop level. The data was obtained using surveys and face-to-face interviews. The following part of the research into the decision-making process was held in two application fields that are highly relevant for our society; manufacturing and health care. The first step was to study the interactions and develop a mathematical model for the replenishment of the car assembly where the problem of “Vehicle routing problem and Inventory” were combined. The next step was to add the scheduling or car production (car sequencing) decision and use some metaheuristics such as ant colony and genetic algorithms to measure if the behaviour is kept up with different case size problems. A similar approach is presented in a production of semiconductors and aviation parts, where a hoist has to change from one station to another to deal with the work, and a jobs schedule has to be done. However, for this problem simulation was used for experimentation. In parallel, the scheduling of operating rooms was studied. Surgeries were allocated to surgeons and the scheduling of operating rooms was analysed. The first part of the research was done in a Teaching hospital, and for the second part the interaction of uncertainty was added. Once the previous problem had been analysed a general framework to characterize the instance was built. In the final chapter a general conclusion is presented. FINDINGS AND PRACTICAL IMPLICATIONS The first part of the contributions is an update of the decision-making literature review. Also an analysis of the possible savings resulting from a change in the decision process is made. Then, the results of the survey, which present a lack of consistency between what the managers believe and the reality of the integration of their decisions. In the next stage of the thesis, a contribution to the body of knowledge of the operation research, with the joint solution of the replenishment, sequencing and inventory problem in the assembly line is made, together with a parallel work with the operating rooms scheduling where different solutions approaches are presented. In addition to the contribution of the solving methods, with the use of different techniques, the main contribution is the framework that is proposed to pre-evaluate the problem before thinking of the techniques to solve it. However, there is no straightforward answer as to whether it is better to have joint or sequential solutions. Following the proposed framework with the evaluation of factors such as the flexibility of the answer, the number of actors, and the tightness of the data, give us important hints as to the most suitable direction to take to tackle the problem. RESEARCH LIMITATIONS AND AVENUES FOR FUTURE RESEARCH In the first part of the work it was really complicated to calculate the possible savings of different projects, since in many papers these quantities are not reported or the impact is based on non-quantifiable benefits. The other issue is the confidentiality of many projects where the data cannot be presented. For the car assembly line problem more computational power would allow us to solve bigger instances. For the operation research problem there was a lack of historical data to perform a parallel analysis in the teaching hospital. In order to keep testing the decision framework it is necessary to keep applying more case studies in order to generalize the results and make them more evident and less ambiguous. The health care field offers great opportunities since despite the recent awareness of the need to improve the decision-making process there are many opportunities to improve. Another big difference with the automotive industry is that the last improvements are not spread among all the actors. Therefore, in the future this research will focus more on the collaboration between academia and the health care sector.

Relevância:

80.00% 80.00%

Publicador: