993 resultados para ASSEMBLY LINES


Relevância:

60.00% 60.00%

Publicador:

Resumo:

People with disabilities have a right to a full life in every sense and one of those fundamental rights is the possibility to work. In this paper, the importance of social employment integration of disabled people is highlighted as one of the stakeholders to be satisfied by companies in the new framework that corporate social responsibility is constructing. The objective of the paper is to revise the benefits of some well-known operations research/management science tools that, if applied correctly, have a double positive impact on work accessibility and improved productivity. The responses collected from managers of Valencia`s ShelteredWork Centres for Disabled by means of a structured questionnaire are used to analyse the level of implementation of these tools and their impact depending on the type of centre, the kind of disability and other structural variables.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a conveyor-based methodology to model complex vehicle flows common to factory and distribution warehouse facilities. The AGV and human path modelling techniques available in many commercial discrete event simulation packages require extensive knowledge and time to implement even the simplest flow control rules for multiple vehicle interaction. Although discrete event simulation is accepted as an effective tool to model vehicle delivery movements, human paths and delivery schedules for modern assembly lines, the time to generate accurate models is a significant limitation of existing simulation-based optimisation methodologies. The flow control method has been successfully implemented using two commercial simulation packages. It provides a realistic visual representation, as well as accurate statistical results, and reduces the model development process cost.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A década de 90 representou significativas mudanças no panorama político econômico brasileiro, especificamente no projeto de desenvolvimento regional denominado Zona Franca de Manaus. Esse projeto foi concebido, primordialmente para integrar essa imensa região Amazônica ao restante do Brasil, em termos de complexa ordem geopolítica dominante nos anos 60. A análise que objetiva essa dissertação trata da evolução do emprego industrial no Pólo Industrial de Manaus na década de 90, com a conotação de expectativas, resultados e possibilidades. A implementação do projeto Zona Franca de Manaus, no que concerne seu Pólo Industrial permitiu que contingentes de mão-de-obra abundante na capital do Estado do Amazonas, tivesse a oportunidade de inserir-se no mercado de trabalho do processo de industrialização moderna. Todavia, essa mão-de-obra abundante não estava preparada para o que as indústrias demandavam, sendo necessários intensivos programas de adequação profissional para que possibilitasse o aproveitamento em processos produtivos de linhas de montagem. o Pólo Industrial de Manaus, apesar de todas as mudanças havidas na economia brasileira no período analisado, obteve significativos alcance de competências na capacitação desse contingente de trabalhadores que foram absorvidos, quando o paradigma da intensividade do fator trabalho imperava no Pólo. Entretanto, o processo de mudança que a globalização econômica e industrial provocou no sistema de produção global, trouxe para o modelo industrial da Zona Franca de Manaus acelerada mudança desse paradigma, resultando variações na demanda por mão-de-obra e acarretando significativo desemprego estrutural. É desse contexto de mudanças que trata o estudo apresentado, analisando a evolução das variáveis que influenciaram no nível de emprego industrial e no mercado de trabalho, as expectativas de novos perfis e as demandas específicas que o novo paradigma de capital intensivo, adotado pelas empresas de classe mundial desse Pólo exigem.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work deals with the sequencing of Multi-Mixed-Model Assembly Lines in a lean manufacturing environment, where an operational structure where several kanbans support several mixed-model assembly lines, so that all assembly lines can receive parts or sub-assemblies from all suppliers. To optimize this system, the sequencing seeks to minimize the distance between the real consumption and the constant ideal consumption of parts or subassemblies, thereby reducing the scaling of kanbans and intermediate stocks. To solve the sequencing problems, the method Clustering Search was applied along with the metaheuristics Variable Neighborhood Search, Simulation Annealing and Iterative Local Search. Instances from the literature and generated instances were tested, thus allowing comparing the methods to each other and with other methods presented in the literature. The performance of the Clustering Search with Iterated Local Search stands out by the quality and robustness of their solutions, and mainly for its efficiency, whereas it converges to better results at a lower computational cost

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this article, we introduce two new variants of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) that allow parallelization of and collaboration between heterogeneous workers. These new approaches suppose an additional level of complexity in the Line Design and Assignment process, but also higher flexibility; which may be particularly useful in practical situations where the aim is to progressively integrate slow or limited workers in conventional assembly lines. We present linear models and heuristic procedures for these two new problems. Computational results show the efficiency of the proposed approaches and the efficacy of the studied layouts in different situations. (C) 2012 Elsevier B.V. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This work deals with the car sequencing (CS) problem, a combinatorial optimization problem for sequencing mixed-model assembly lines. The aim is to find a production sequence for different variants of a common base product, such that work overload of the respective line operators is avoided or minimized. The variants are distinguished by certain options (e.g., sun roof yes/no) and, therefore, require different processing times at the stations of the line. CS introduces a so-called sequencing rule H:N for each option, which restricts the occurrence of this option to at most H in any N consecutive variants. It seeks for a sequence that leads to no or a minimum number of sequencing rule violations. In this work, CS’ suitability for workload-oriented sequencing is analyzed. Therefore, its solution quality is compared in experiments to the related mixed-model sequencing problem. A new sequencing rule generation approach as well as a new lower bound for the problem are presented. Different exact and heuristic solution methods for CS are developed and their efficiency is shown in experiments. Furthermore, CS is adjusted and applied to a resequencing problem with pull-off tables.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La presente Tesis persigue la definición y el desarrollo de un sistema basado en el conocimiento que permita la generación de modelos de líneas de montaje durante la fase conceptual de definición de una aeroestructura aeronáutica. Para ello, se propone la definición de un modelo formal del proceso en concurrencia asociado al diseño de líneas de montaje en la fase conceptual, y de un modelo de la estructura de datos básica para soportar dicho proceso. Ambos modelos sirven de base para el desarrollo de una aplicación de prueba de concepto en el entorno del sistema comercial CAX-PLM CATIA v5. Los modelos de línea generados integran las tres estructuras básicas definidas en el modelo propuesto: producto, procesos y recursos. Los modelos generados son estructuras “de montaje”, basadas en estructuras de producto “de fabricación” a su vez derivadas de estructuras “de diseño”. Cada modelo generado se evalúa en términos de cuatro estimaciones básicas: dimensiones máximas del nodo producto, distancia de transporte y medio a utilizar, tiempo total de ejecución y coste total. La generación de modelos de línea de montaje se realiza en concurrencia con la función diseño de producto, teniendo por tanto la oportunidad de influir en la misma e incluir requerimientos de fabricación y montaje al producto en las primeras fases de su ciclo de vida, lo que proporciona una clara ventaja competitiva. El desarrollo propuesto en esta Tesis permite sentar las bases para realizar desarrollos con objeto de asistir a los diseñadores durante la fase conceptual de generación de diseños de líneas de montaje. La aplicación prototipo desarrollada demuestra la viabilidad de la propuesta conceptual que se realiza en la Tesis. ABSTRACT The current thesis proposes the definition and development of a knowledge-based system to generate aircraft components assembly line models during the conceptual phase of the product life cycle. With this objective, the definition of a formal activity model to represent the design of assembly lines during the conceptual phase is proposed; such model considers the concurrence with the product design process. Associated to the activity model, a data structure model is defined to support such process. Both models are the basis for the development of a proof of concept application within the environment of the commercial CAX-PLM system CATIA v5. The generated assembly line models integrate the three basic structures defined in the proposed model: product, processes and resources. The generated models are “As Prepared” structures based on “As Planned” structures derived from “As Designed” structures. Each generated model is evaluated in terms of four basic estimates: maximum dimensions of the product node, transport distance and transport mean to be used, total execution time and total cost. The assembly line models generation is made in concurrence with the product design function. Therefore, it provides the opportunity to influence on it and allows including manufacturing and assembly requirements early in the product life cycle, which gives a clear competitive advantage. The development proposed in this Thesis allows setting the foundation to carry out further developments with the aim of assisting designers during the conceptual phase of the assembly line design process. The developed prototype application shows the feasibility of the conceptual proposal presented in the Thesis.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

AIRBUS Military has undertaken a project to implement the industrial Digital Mock-Up (iDMU) concept to support the industrialization process of a medium size aerostructure. Within the framework of a collaborative engineering strategy, such project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircrafts assembly lines. The project has confirmed the potential of the iDMU to improve the industrial design process in a collaborative engineering environment. This communication presents the main project objectives, the key methodological points, the main project achievements and the next additional developments to increase the scope and benefits of the iDMU concept.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Airbus designs and industrializes aircrafts using Concurrent Engineering techniques since decades. The introduction of new PLM methods, procedures and tools, and the need to reduce time-to-market, led Airbus Military to pursue new working methods. Traditional Engineering works sequentially. Concurrent Engineering basically overlaps tasks between teams. Collaborative Engineering promotes teamwork to develop product, processes and resources from the conceptual phase to the start of the serial production. The CALIPSO-neo pilot project was launched to support the industrialization process of a medium size aerostructure. The aim is to implement the industrial Digital Mock-Up (iDMU) concept and its exploitation to create shop floor documentation. In a framework of a collaborative engineering strategy, the project is part of the efforts to deploy Digital Manufacturing as a key technology for the industrialization of aircraft assembly lines. This paper presents the context, the conceptual approach and the methodology adopted.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Os objetivos desta pesquisa foram levantar os benefícios auferidos pela aplicação de melhorias na ergonomia dos postos de trabalho e no abastecimento planejado de peças em uma linha de montagem automotiva, bem como identificar e verificar até que ponto pode-se gerar vantagens competitivas na redução do tempo de montagem do veículo, com a aplicação de investimentos tecnológicos em ergonomia na área de manufatura. A metodologia Methods Time Measurement (MTM), foi escolhida para mensurar as diferenças de tempos de processo, e para coleta e identificação de dados. Foram observadas duas linhas de montagem: a primeira denominada de inovadora, construída há três anos com investimentos em soluções ergonômicas, tanto no abastecimento quanto no processo, e outra, tradicional, construída há 20 anos, com poucos investimentos na área. De posse dos dados necessários dos sistemas estudados e com o uso da tecnologia MTM, a pesquisa avalia e propõe meios de mensurar os ganhos com a redução de atividades que não agregam valor ao produto, com o intuito de viabilizar investimentos em ergonomia em postos de trabalho padronizados, manipuladores, instalações mais modernas e até possuir um time de planejamento de processos de produção mais robusto. Neste trabalho, analisa-se também a influência da ergonomia no custo do produto final, qualidade, retrabalhos, afastamentos médicos e absenteísmo entre outros.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The theoretical analysis and research of cultural activities have been limited, for the most part, to the study of the role the public sector plays in the funding and support of nonprofit Arts organizations. The tools used to evaluate this intervention follow a macroeconomic perspective and fail to account for microeconomic principles and assumptions that affect the behavior of these organizations. This dissertation describes through conceptual models the behavior of the agents involved in the artistic process and the economic sectors affected by it. The first paper deals with issues related to economic impact studies and formulates a set of guidelines that should be followed when conducting this type of study. One of the ways to assess more accurately the impact culture has in a community is by assuming that artists can re-create the public space of a blight community and get it ready for a regeneration process. The second paper of this dissertation assumes just that and explains in detail all the cultural, political, economic and sociological interactions that are taking place in the Arts-led regeneration process in Miami Beach, Florida. The paper models the behavior of these agents by indicating what their goals and decision process mechanisms are. The results give support to the claim that the public space artists create in a city actually stimulate development. The third paper discusses the estimation of a demand function for artistic activities, specifically the New World Symphony (NWS) located in Miami Beach, Florida. The behavior of the consumers and producers of NWS' concerts is modeled. The results support the notion that consumers make their decisions based, among other things, on the perceived value these concerts have. Economists engage in the analysis of the effects of cultural activities in a community since many cities rely on them for their development. The history of many communities is not told by their assembly lines and machinery anymore but by their centers of entertainment, hotels and restaurants. Many cities in Europe and North America that have seen the manufacturing sector migrate to the South are trying to face the demands of the new economy by using the Arts as catalysts for development. ^

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.