868 resultados para clinical risk management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis consists of an introductory chapter (essay I) and five more empirical essays on electricity markets and CO2 spot price behaviour, derivatives pricing analysis and hedging. Essay I presents the structure of the thesis and electricity markets functioning and characteristics, as well as the type of products traded, to be analyzed on the following essays. In the second essay we conduct an empirical study on co-movements in electricity markets resorting to wavelet analysis, discussing long-term dynamics and markets integration. Essay three is about hedging performance and multiscale relationships in the German electricity spot and futures markets, also using wavelet analysis. We concentrate the investigation on the relationship between coherence evolution and hedge ratio analysis, on a time-frequency-scale approach, between spot and futures which conditions the effectiveness of the hedging strategy. Essays four, five and six are interrelated between them and with the other two previous essays given the nature of the commodity analyzed, CO2 emission allowances, traded in electricity markets. Relationships between electricity prices, primary energy fuel prices and carbon dioxide permits are analyzed on essay four. The efficiency of the European market for allowances is examined taking into account markets heterogeneity. Essay five analyzes stylized statistical properties of the recent traded asset CO2 emission allowances, for spot and futures returns, examining also the relation linking convenience yield and risk premium, for the German European Energy Exchange (EEX) between October 2005 and October 2009. The study was conducted through empirical estimations of CO2 allowances risk premium, convenience yield, and their relation. Future prices from an ex-post perspective are examined to show evidence for significant negative risk premium, or else a positive forward premium. Finally, essay six analyzes emission allowances futures hedging effectiveness, providing evidence for utility gains increases with investor’s preference over risk. Deregulation of electricity markets has led to higher uncertainty in electricity prices and by presenting these essays we try to shed new lights about structuring, pricing and hedging in this type of markets.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Long-term contractual decisions are the basis of an efficient risk management. However those types of decisions have to be supported with a robust price forecast methodology. This paper reports a different approach for long-term price forecast which tries to give answers to that need. Making use of regression models, the proposed methodology has as main objective to find the maximum and a minimum Market Clearing Price (MCP) for a specific programming period, and with a desired confidence level α. Due to the problem complexity, the meta-heuristic Particle Swarm Optimization (PSO) was used to find the best regression parameters and the results compared with the obtained by using a Genetic Algorithm (GA). To validate these models, results from realistic data are presented and discussed in detail.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the optimal involvement in derivatives electricity markets of a power producer to hedge against the pool price volatility. To achieve this aim, a swarm intelligence meta-heuristic optimization technique for long-term risk management tool is proposed. This tool investigates the long-term opportunities for risk hedging available for electric power producers through the use of contracts with physical (spot and forward contracts) and financial (options contracts) settlement. The producer risk preference is formulated as a utility function (U) expressing the trade-off between the expectation and the variance of the return. Variance of return and the expectation are based on a forecasted scenario interval determined by a long-term price range forecasting model. This model also makes use of particle swarm optimization (PSO) to find the best parameters allow to achieve better forecasting results. On the other hand, the price estimation depends on load forecasting. This work also presents a regressive long-term load forecast model that make use of PSO to find the best parameters as well as in price estimation. The PSO technique performance has been evaluated by comparison with a Genetic Algorithm (GA) based approach. A case study is presented and the results are discussed taking into account the real price and load historical data from mainland Spanish electricity market demonstrating the effectiveness of the methodology handling this type of problems. Finally, conclusions are dully drawn.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação de Mestrado apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Auditoria, sob orientação do Mestre Fernando Teixeira Pinto

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to conduct a methodical drawback analysis of a financial supplier risk management approach which is currently implemented in the automotive industry. Based on identified methodical flaws, the risk assessment model is further developed by introducing a malus system which incorporates hidden risks into the model and by revising the derivation of the most central risk measure in the current model. Both methodical changes lead to significant enhancements in terms of risk assessment accuracy, supplier identification and workload efficiency.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Enterprise Risk Management (ERM) is gaining relevance among financial and non-financial companies but its benefits still are uncertain. This paper aims at investigating the relationship between ERM adoption and firm performance based on a sample of 1130 non-financial companies belonging to the STOXX® index. A content analysis of individual accounts is performed to distinguish adopters, and a regression analysis explores the effect of ERM adoption on firm performance, proxied by Tobin’s Q. The findings suggest that there is a statistical significant positive effect of ERM adoption on firm performance, meaning that firms are benefiting from the implementation of this process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rapport de recherche

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Les quatre principales activités de la gestion de risque thérapeutique comportent l’identification, l’évaluation, la minimisation, et la communication du risque. Ce mémoire aborde les problématiques liées à l’identification et à la minimisation du risque par la réalisation de deux études dont les objectifs sont de: 1) Développer et valider un outil de « data mining » pour la détection des signaux à partir des banques de données de soins de santé du Québec; 2) Effectuer une revue systématique afin de caractériser les interventions de minimisation de risque (IMR) ayant été implantées. L’outil de détection de signaux repose sur la méthode analytique du quotient séquentiel de probabilité (MaxSPRT) en utilisant des données de médicaments délivrés et de soins médicaux recueillis dans une cohorte rétrospective de 87 389 personnes âgées vivant à domicile et membres du régime d’assurance maladie du Québec entre les années 2000 et 2009. Quatre associations « médicament-événement indésirable (EI) » connues et deux contrôles « négatifs » ont été utilisés. La revue systématique a été faite à partir d’une revue de la littérature ainsi que des sites web de six principales agences réglementaires. La nature des RMIs ont été décrites et des lacunes de leur implémentation ont été soulevées. La méthode analytique a mené à la détection de signaux dans l'une des quatre combinaisons médicament-EI. Les principales contributions sont: a) Le premier outil de détection de signaux à partir des banques de données administratives canadiennes; b) Contributions méthodologiques par la prise en compte de l'effet de déplétion des sujets à risque et le contrôle pour l'état de santé du patient. La revue a identifié 119 IMRs dans la littérature et 1,112 IMRs dans les sites web des agences réglementaires. La revue a démontré qu’il existe une augmentation des IMRs depuis l’introduction des guides réglementaires en 2005 mais leur efficacité demeure peu démontrée.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.