917 resultados para Logistics


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article discusses, in general matters, the economic and social motivations, the organization and development of the program Minha Casa Minha Vida, made in 2009, by Federal Government of Brazil. The objective of this work was to analyse the Brazilian economic and housing context, and the program relation with the Subprime international crisis, which has been started at United States in 2008, as well as analysing and discussing the logistics and the program accessibility. The MCMV program, part of the PAC – Programa de Aceleração do Crescimento – has the intention to combat the economic crisis that had been installed and also minimize the deficit housing of the country. From PAC's initial estimate, US$250 Bi, it has been spent US$129 Bi and it has already been approved more than US$125 Bi designated for the second stage of the program, whose the estimate of PAC2 is about one trillion and a half of brazilian reais. One million homes were built between 2009 and 2012, and the goal for 2014 is two million and a half of new residences. If comparing the current program with the oldest programs, progress were observed ,however, problems and inconsistences are clearly seen: in the real concernment, the truly beneficiary, and contradiction between a social and economic program to urban demands, among other situational factors. It’s also evident, the incentivation for a new residential and closed neighbourhoods, thereby adding to the fragmentation of the urban space, beyond of the exclusion socioespacial caused financing of residences in farest allotments. The capitalist production of the space it’s clearly thriving in analysis of thisfinancing package of the urban habitation, where the biggest glebas rise between central neighbourhood and the newest generated suburb, they evidence the negligence of the authorities in well managing the space, not executing the application of urban instruments of planning the social function, and...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The world is an environment in constant process of globalization, where physical boundaries are no longer limits. The competitiveness has also evolved, forcing companies to adopt efficient practices in order to increase productivity gains, reduce losses and improve quality. Nowadays, the supply chain management and its element, including the internal logistics, is regarded as a key element for gaining competitiveness. Thus, this study focused on identifying and implementing improvements in the internal raw materials transport operations of a consumer goods company, based on concepts and tools of the lean thinking. The results showed considerable gains in productivity with consequent cost reduction, proving the efficiency of the methodology lean even in support areas of an organization.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Faced with the global discussion about the development of new alternative energy sources, this work tries to contribute to the understanding of the introduction of biodiesel in the energy market, identifying the barriers in the social logic, economic and productive in different spaces, rural and urban. Based on the guidelines of the National Biodiesel Production and Use Program (PNPB), it intended to accompany the implementation of public policies in relation to family farmers settled in the Pontal, located in the western region of São Paulo. In parallel, we will analyze the organizational structure and logistics of the production of biodiesel in the city, although it does not dependent on agricultural production and it is not a target of public policies, it takes advantage of the demand created by PNPB when it comes to increasing the amount of biodiesel blended with mineral origin diesel. The activity examined in the urban space is the collection of used frying oil held by Ecosanta Biofuels, a company located in the town of Maua, São Paulo metropolitan region. The monograph aims to broaden our understanding despite the urban-rural issue regarding the obstacles and opportunities in expanding renewable energy

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a case study in a largebeverage company,which suffers fromlack of inputs. Through 5 Whys analysis,it was possible to find the root causes of the problem: the bad fleet sizing deliveriesand low capacityof storage of inputs. Through the use of simulation, it was possible to determine theactual fleet required, and it was alsoquantified thespace required for thestorage ofloads.Based on these results andconsidering the cost, it waspossible todetermine which the most effective solutions toreducing the initialproblem: the increase of storage capacity, considered the best option, even demanding time, or the increase of the fleet, considered a stopgap measure to partially solve the problem until the first solution is finalized

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La performance desentreprises ça dépend, engrande partie, deses chaînesd’approvisionnement. Celas peuvent entretrès complexe, car elle implique tout le processus avant, pendant et après l’assemblage duproduit fini. Ce travaila donc comme objectifl’amélioration de lagestion des imprévus qu’arrivent audébutdela chaîne d’approvisionnement et lesimpacts sur l’approvisionnement de la ligne d’assemblage d’une usine. L’approche méthodologique utilisée est la recherche-action. De cette façon, ce travail présente une standardisation des processusquechaque département doit fairedans uncas de rupture dans la chaîne. D’après entretiens, analyses de document, standardisation des organigrammes et graphiques croisés dynamiques, ila été possible proposer un moyen plus critique d’analyser et résoudre certains problèmes. En tant que résultats, viennent un organigramme défini, une divulgation des informations plus précises pour la prise en décision et unes l’analyse critique de l’historique des imprévus. Il s’agit d’un ensemble des processus meilleur pour une bonne prise en décision de court, moyen et long terme pour les dépenses avec des imprévus dans l’approvisionnement de matière-première de l’usine

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present study aimed to analyze how develops the reverse logistics process applied in electrical and electronic products. Such analysis was obtained through literature search and with the completion of a case study, which was developed at the company's Oxil Reverse Manufacture, showing the advantages obtained as well as the difficulties faced in the implementation of the reverse logistics process. The development of this research shows its importance in so far as the residues generated by electronic components, which are one of the most harmful to the environment and harmful to human health, highly possessing heavy metals and non-biodegradable materials in their composition. In this way, the components collected from this activity, should be properly recycled, reused and finally housed in suitable location, these steps that are part of the reverse logistics process

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Increasingly competitive markets have driven the search for companies in many different ways to win and keep customers. The service level is basically the performance of companies in fulfilling the orders made, or how companies demonstrate to their clients efforts in their behalf. This work aims to solve the difficulties faced by a multinational company present in Brazil, in the distribution of its products in the category Ice Cream in order to improve the service level of their customers. Review the logistics network and concepts related to the distribution system of products is one of several ways to achieve this goal, as well as the use of IT and tools to assist in planning and programming of the physical distribution of products. In this study we used the concept of direct distribution system called Transit Point (TP). The TP provides at the same time, a strategy of rapid response, flexibility, low transportation costs and no inventory. A router - software capable of simulating the actual conditions experienced in the daily distribution - was used to assist in calculations. Results showed reductions of up to 47.5% in transportation costs and better conditions were provided in the distribution of products, positively impacting on service levels and in the maintenance of products quality, with a reduction of 1.6% of the total costs involve

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work is quantified according to the ABEPRO areas, the number of works the Course Conclusion (TCCs) and Hours (CH) Course of Production Engineering, UNESP Guaratinguetá. Based on this quantification were found to be significant discrepancies between the TCCs and CH. Quality and Logistics observed for the larger discrepancies, with 26% and 17% of the number of TCCs, respectively. Both areas have only 6% of the time. They are also used data from researchers at the National Council of Scientific and Technological Development (CNPq) in the areas of Production Engineering. In the area of Quality and Logistics, the researchers account for 8% and 5%, respectively, but are most prominent researchers in the field of Operations Research, with 37%. However, this view can help the department to organize the curriculum, with the development of teaching projects, methods and means of education, and visibility to help future hiring for the department

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Because of the constant increasing global competition, companies increasingly need to develop new competitive advantages and in this context a good logistics system can be both an opportunity for cost reduction and a differential on the client. The system starts at its base, which is formed by the inventory policies. These policies were created to address the strategic issues such as: How much to keep in inventory? How often placing orders? What is the optimal order size? This paper presents a model applied to a real situation of the industry in order to demonstrate the impacts of these policies on costs, as well as a literature review of existing literature related to the subject, for the construction limits and conditions of the model. By applying these concepts the model has been formatted and applied to three different policies, providing a simulation of the results. Finally a comparison is made between the three policies shown and the policy that bests fits the companies’ requirements is indicated

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper seeks to show which impacts there are of the combined use of different modal for the coffee’s outflow. Nowadays is used, almost exclusively, the roadway to transport. How-ever, for this product with low added value, the types of transports best suited, in the litera-ture, are the railway and waterway. For this, is describe the development and spread of coffee throughout Brazil. Subsequently, is calculate the current cost of transporting two producing regions (Minas Gerais and Rondônia), using for that information about the freight, the social cost, and the level of losses along the way. After that is projected costs if utilizes the multi-modal model, when considering the same cost parameters used for the current model. Here-after, an analysis is made of the obtained cost, speed, consistency, capacity, availability and frequency of each transport model. Therefore, note that the multi-modal system is more ef-ficient and economical than current, based on transport by road

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wind power is a type of energy that is still not too explored in Brazil and, because of the lack of experience in projects of this size, there are still some problems during the stages of planning and execution of wind farms projects. One of these problems is related with the parts’ transportation logistics, since these parts are difficult to transport, because of their length, weight or shape. Furthermore, another aggravating factor is the lack of options regarding to the transportation modals that are available to do the route between the manufacture place and the project site. To help in the decision-making process about the ideal transportation configuration, aiming to reduce the dependence of the logistics’ coordinator, it was chosen to use he AHP method to compare some criteria that have influence in the modal’s choice process. The criteria, determined by the members of the company’s logistics’ department, are: transportation costs, transportation time and the risk of causing damages to the cargo. The results shown by this model, using theoretical background, that standardize the processes related to the modal’s choice

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the supply chain management there are several risk factors that must be mitigated to increase the flow of production and as a possible solution the literature cites the implementation of a warehouse management system, but this subject is few explored. This thesis has as main objective the study of the implementation of a warehouse management system in a company from the automotive sector that produces clutches. As results, are shown data of the characterization of items; as well as data and comparisons between disruptions in production reports due to lack of material before and after the implementation of WMS and is presented the result of a questionnaire applied to the involved on the implementation of the system, the results were associated with the risk factors on the implementation of the system studied on the literature review, and enumeration of the results that are not associated with any factors previously studied. And finally, the study is concluded and are recommended future studies related to the theme

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Due to the high level of service required by customers and the constant need to reduce costs, the logistics can be considered as a strategic area for a company. In particular, the order picking is responsible for most of the operating costs in a warehouse. Therefore it’s necessary to plan the materials storage in order to maximize the space available and minimize the total distance traveled to meet customer orders. For these reasons, this study aims to examine and propose a way to organize the electrical materials storage in distribution centers through a study on an electronics company in Cajamar

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work was based on a case study of improvement of the warehouse layout of a multinational automotive glass sector, located in the State of Sao Paulo. The aim was to propose a layout template to be more effective and besides optimizing production would also promote an increase in warehouse packaging capacity for metal containers containing glasses, thus reducing operating costs. To achieve the desired purpose, it was developed two layout proposals and to this end inventory management tools have been used, such as ABC curve and the Spaghetti Diagram, and other concepts of Packaging Engineering and Logistics. By the end of this work, it was obtained as a result, a project in which it was possible to rearrange the packages according the demand, and the developed changes became the most efficient layout both in storage capacity as well as in the internal drive