983 resultados para Research Design


Relevância:

60.00% 60.00%

Publicador:

Resumo:

This master thesis aims to identify work-related factors making Belgian nurses consider leaving their job voluntary and to compare the work-related factors across different generations. The purpose of this master thesis has a descriptive nature of research. The research approach chosen is a deductive approach and the research design chosen is a quantitative research design. Cluster sampling in combination with simple random sampling was used as sampling technique. 128 nurses were surveyed from April to May 2016. Nurses who reported to leave the organization due to retirement reasons, temporary employment contract or maternity leave were excluded from the study as this study investigates the voluntary turnover intention. A total of 68 nurses were included in the study which indicates an overall response rate of 53 %. Numerous of the findings in this master thesis are consistent with previous studies on turnover intention of different generations in other western-countries than Belgium. The work-related factor workload was most often reported by Belgian nurses with no intention to leave their job. Belgian nurses with an intention to leave their job indicated most often the work-related factor (non-)financial benefits. The generation-specific findings indicated both similarities and differences between the work-related factors selected. It was observed that Baby Boomers with an intention to leave their job selected most often variables related to the work-related factors (non-)financial benefits, supportive organization and workload. The variable lack of recognition appeared among Baby Boomers with an intention and no intention to leave their job. Surprisingly was the often selected variables lack of direct and/clear feedback on performances and unsupportive supervisor among Baby Boomers with professional turnover intention. Further, it was observed that Generation Xers with an intention to leave their job selected most often variables related to the work-related factors supportive organization, communication, (non-)financial benefits, work content and workload. The variables inadequate opportunity for advancement/professional growth and imbalance work-life appeared among Generation Xers with an intention and no intention to leave their job. Generation Yers with an intention to leave their job selected most frequently variables related to the work-related factors (non-)financial benefits, workload and commitment. The variables inadequate salary and opportunities elsewhere appeared among nurses with an intention and no intention to leave their job. Surprisingly was the often selected variable inadequate salary among Generation Yers with professional turnover intention.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Bakgrund: Employer Branding är ett relativt nytt begrepp som har börjat användas som en strategi inom Human Resource Management. Genom att utveckla ett Employer Brand kan or-ganisationer attrahera och behålla talangfull arbetskraft och på så vis säkra sin överlevnad. Det saknas emellertid forskning på hur Employer Branding kan användas i offentlig verksamhet för att attrahera den senaste generationen på arbetsmarknaden; Generation Y. Syfte: Öka förståelse för hur statliga myndigheter kan arbeta med Employer Branding för att attrahera Generation Y. Metod: Studien baseras på kvalitativ metod och har en fenomenologisk samt deduktiv forsk-ningsansats. Undersökningsdesignen var i form av en fallstudie. Nio semistrukturerade inter-vjuer har genomförts med respondenter på Bolagsverket, varav fyra intervjuer med personer som har inflytande över Employer Branding och fem med personer ur Generation Y. Teorier: "Employer Branding Predictive Model" Slutsatser: I studien visar att den statliga arbetsgivaren är attraktiv för Generation Y. Proble-matiken ligger i att det finns brister beträffande hur kommunikationen av arbetsgivarvarumärket ser ut externt. Utan en uttalad målgrupp och ett uttalat Employee Value Proposition blir den externa kommunikationen otydlig vilket minskar arbetsgivarens attraktionskraft hos potentiella arbetstagare. Attraktiviteten uppstår först när individen från Generation Y redan rekryterats in i organisationen.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – Employee turnover entails considerable costs and is a major problem for the construction industry. By creating an extensive framework, this study aims to examine whether perceived work-related factors affect turnover intention in South Korean construction companies. Research design – The paper is based on the results of a questionnaire of 136 employees that was conducted and provided by a Korean construction company. Research hypotheses were tested via correlation analyses. The most influencing work-related factors, as well as differences among job levels, were determined by multiple regression analyses. Findings – Communication, immediate leaders, organizational commitment, and organizational pride substantially affect turnover intentions. All of these factors can be considered as relational factors. The most influencing factors differ among job levels. Discussion/practical implications – Immediate leaders should be aware of their role in retaining employees and enhance communication, organizational commitment and pride. This study shows how the importance of certain variables differs for groups of employees. Theoretical implications/limitations– This study is based on a sample of employees from a Korean construction company. Therefore, the generalizability of the findings has to be tested. Future research should test the proposed framework with other factors or resources. Originality/value – This study shed light on the turnover subject in the South Korean construction industry. It shows that different factors can influence turnover intention among job levels. A framework was created, which is based on 16 work-related factors including organizational factors, HRM practices and job attitudes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – Employee turnover entails considerable costs and is a major problem for the construction industry. By creating an extensive framework, this study aims to examine whether perceived work-related factors affect turnover intention in South Korean construction companies. Research design – The paper is based on the results of a questionnaire of 136 employees that was conducted and provided by a Korean construction company. Research hypotheses were tested via correlation analyses. The most influencing work-related factors, as well as differences among job levels, were determined by multiple regression analyses. Findings – Communication, immediate leaders, organizational commitment, and organizational pride substantially affect turnover intentions. All of these factors can be considered as relational factors. The most influencing factors differ among job levels. Discussion/practical implications – Immediate leaders should be aware of their role in retaining employees and enhance communication, organizational commitment and pride. This study shows how the importance of certain variables differs for groups of employees. Theoretical implications/limitations– This study is based on a sample of employees from a Korean construction company. Therefore, the generalizability of the findings has to be tested. Future research should test the proposed framework with other factors or resources. Originality/value – This study shed light on the turnover subject in the South Korean construction industry. It shows that different factors can influence turnover intention among job levels. A framework was created, which is based on 16 work-related factors including organizational factors, HRM practices and job attitudes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Research Project HR-124, "Development of a Laboratory Durability Test for Asphalts," was initiated in 1966 as a long range comprehensive program. Its ultimate objective was to develop a simple, rapid laboratory test that could be used by highway engineers to select paving asphalt according to quality, to identify inferior asphalts, and to reasonably predict the useful life of asphalts once they were incorporated in the pavements. This report, designated Progress Report No. 3, summarizes the work accomplished during the second year of the HR-124 extension (1967 - 1969), i. e., the period from 1 October 1968 to 31 October 1969.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

One significant benefit of asphalt concrete pavement construction is that it may be opened to traffic within one hour after being laid. Therefore, road closure and detour are not necessary, but only temporary lane closure and control of traffic. This one lane construction, even though desirable in regard to maintaining traffic flow, does pose an additional problem. The longitudinal joint at centerline often becomes a maintenance problem. The objective of this research project is to identify construction procedures that will provide an improved centerline joint.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1951, a total of 68,869 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2676 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads ----------------- $24,000,000 For secondary roads---------------- $41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) Unobligated available farm to market road funds are rapidly being placed under contract. (i) The letting of highway contracts is increasing rapidly. (j)- Iowa's highway program is estimated to cost $945,000,000 and will require twenty years to build. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1952, a total of 71,493 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2662 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads------------------$23,000,000 For secondary roads---------------- 41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) The surplus of farm to market road funds created during and immediately following the War have now been placed under contract, with only a minimum working balance remaining in the fund. (i) Iowa's highway program was estimated to cost $945,000,000 and to require twenty years to build, by the 1948 Legislative Committee. This estimate would now have to be increased due to price increases and higher required standards. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,451 miles of rural roads, both primary and secondary. (b) On January 1, l954, a total of 77,024 miles of these rural roads were surfaced - mostly with gravel and crushed stone. This is 5,53l miles greater than on January l, 1952. (c) Additional roads are being surfaced at the rate of 2766 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 25.4 per cent from property taxes and special taxes......................................$29,708,546.67 63.7 per cent from road use taxes.......... 74,581,080.30 10.6 per cent from Federal Aid (1952 Act).. 12,424,000.00 0.3 per cent from miscellaneous receipts.. 287,922.86 ---- ------------- 100.0 $117,001,549.83 (f) Annual income under present laws, available for highway construction, is approximately, For primary roads $29,420,000.00 For secondary roads $44,328,000.00 In 19_3, $7,299,000 of secondary road construction funds was transferred to the maintenance fund. (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A discussion of several issues related to road construction, including budget, legislation, maintenance, and pending improvements.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The spacing of adjacent wheel lines of dual-lane loads induces different lateral live load distributions on bridges, which cannot be determined using the current American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) or Load Factor Design (LFD) equations for vehicles with standard axle configurations. Current Iowa law requires dual-lane loads to meet a five-foot requirement, the adequacy of which needs to be verified. To improve the state policy and AASHTO code specifications, it is necessary to understand the actual effects of wheel-line spacing on lateral load distribution. The main objective of this research was to investigate the impact of the wheel-line spacing of dual-lane loads on the lateral load distribution on bridges. To achieve this objective, a numerical evaluation using two-dimensional linear elastic finite element (FE) models was performed. For simulation purposes, 20 prestressed-concrete bridges, 20 steel bridges, and 20 slab bridges were randomly sampled from the Iowa bridge database. Based on the FE results, the load distribution factors (LDFs) of the concrete and steel bridges and the equivalent lengths of the slab bridges were derived. To investigate the variations of LDFs, a total of 22 types of single-axle four-wheel-line dual-lane loads were taken into account with configurations consisting of combinations of various interior and exterior wheel-line spacing. The corresponding moment and shear LDFs and equivalent widths were also derived using the AASHTO equations and the adequacy of the Iowa DOT five-foot requirement was evaluated. Finally, the axle weight limits per lane for different dual-lane load types were further calculated and recommended to complement the current Iowa Department of Transportation (DOT) policy and AASHTO code specifications.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The dynamic interaction of vehicles and bridges results in live loads being induced into bridges that are greater than the vehicle’s static weight. To limit this dynamic effect, the Iowa Department of Transportation (DOT) currently requires that permitted trucks slow to five miles per hour and span the roadway centerline when crossing bridges. However, this practice has other negative consequences such as the potential for crashes, impracticality for bridges with high traffic volumes, and higher fuel consumption. The main objective of this work was to provide information and guidance on the allowable speeds for permitted vehicles and loads on bridges .A field test program was implemented on five bridges (i.e., two steel girder bridges, two pre-stressed concrete girder bridges, and one concrete slab bridge) to investigate the dynamic response of bridges due to vehicle loadings. The important factors taken into account during the field tests included vehicle speed, entrance conditions, vehicle characteristics (i.e., empty dump truck, full dump truck, and semi-truck), and bridge geometric characteristics (i.e., long span and short span). Three entrance conditions were used: As-is and also Level 1 and Level 2, which simulated rough entrance conditions with a fabricated ramp placed 10 feet from the joint between the bridge end and approach slab and directly next to the joint, respectively. The researchers analyzed and utilized the field data to derive the dynamic impact factors (DIFs) for all gauges installed on each bridge under the different loading scenarios.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Laser scanning is a terrestrial laser-imaging system that creates highly accurate three-dimensional images of objects for use in standard computer-aided design software packages. This report describes results of a pilot study to investigate the use of laser scanning for transportation applications in Iowa. After an initial training period on the use of the scanner and Cyclone software, pilot tests were performed on the following projects: intersection and railroad bridge for training purposes; section of highway to determine elevation accuracy and pair of bridges to determine level of detail that can be captured; new concrete pavement to determine smoothness; bridge beams to determine camber for deck-loading calculations; stockpile to determine volume; and borrow pit to determine volume. Results show that it is possible to obtain 2-6 mm precision with the laser scanner as claimed by the manufacturer compared to approximately one-inch precision with aerial photogrammetry using a helicopter. A cost comparison between helicopter photogrammetry and laser scanning showed that laser scanning was approximately 30 percent higher in cost depending on assumptions. Laser scanning can become more competitive to helicopter photogrammetry by elevating the scanner on a boom truck and capturing both sides of a divided roadway at the same time. Two- and three-dimensional drawings were created in MicroStation for one of the scanned highway bridges. It was demonstrated that it is possible to create such drawings within the accuracy of this technology. It was discovered that a significant amount of time is necessary to convert point cloud images into drawings. As this technology matures, this task should become less time consuming. It appears that laser scanning technology does indeed have a place in the Iowa Department of Transportation design and construction toolbox. Based on results from this study, laser scanning can be used cost effectively for preliminary surveys to develop TIN meshes of roadway surfaces. It also appears that this technique can be used quite effectively to measure bridge beam camber in a safer and quicker fashion compared to conventional approaches. Volume calculations are also possible using laser scanning. It seems that measuring quantities of rock could be an area where this technology would be quite beneficial since accuracy is more important with this material compared to soil. Other applications for laser scanning could include developing as-built drawings of historical structures such as the bridges of Madison County. This technology could also be useful where safety is a concern such as accurately measuring the surface of a highway active with traffic or scanning the underside of a bridge damaged by a truck. It is recommended that the Iowa Department of Transportation initially rent the scanner when it is needed and purchase the software. With time, it may be cost justifiable to purchase the scanner as well. Laser scanning consultants can be hired as well but at a higher cost.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. This five-year program documents $3.5 billion of highway and bridge construction projects on the primary road system using federal and state funding. Of that funding, a little over $500 million is available due to the passage of Senate File 257 in February 2015. As required by Senate File 257, this program includes a list of the critical highway and bridge projects funded with the additional revenue. Since last year’s program, a new federal surface transportation authorization bill was passed and signed into law. This authorization bill is titled Fixing America’s Surface Transportation (FAST) Act. The FAST Act, for the first time in many years, provides federal funding certainty over most of the time covered by this Program. In addition, it provided additional federal funding for highway and bridge projects.