In recent years, the Brazilian construction industry has gone by changes like currency stability, increasing competition, shortage of skilled labor and increasing quality importance required by the customer, who made the sector companies seek solutions through new management practices in order to become more efficient. A alternative to these management practices is known as Lean Construction which is derived from the Toyota System Production. Lean Construction main goals are to reduce parts of activities that do not add value, increase product value by considering customer needs, reduce variability and production cycle time, simplify process by reducing the number of parts or steps, increase the flexibility in the product execution and transparency process, focus the control on overall process, introduce continuous improvement process, maintain a balance between improvements in flows and conversions and seek to learn from practices adopted by competitors. However, the construction industry is characterized by having nomadic activity, which undertakes an unique product with high cost of production and big inertia for behavioral change, making it difficult to implement the philosophy of lean construction in companies. In this sense, the main objective of this study is to develop a methodology for implementation of the principles of Lean Construction. The method of implementing the proposed management system was designed with the aid of 5W2H tool, and the implementation process is divided into three phases. The first one aims to know in a macro way the current operation of construction, identify who is its target audience and what are the products and services offered to the Market. The second phase aims to describe what actions should be taken and which documents are needed to be created or modified; finally, the third step goal consists in how to control and monitor established processes, where through Strategic Planning the company goals would be set along with their respective targets and indicators in order to keep the system working, aiming for continuous improvement with focus on the customer. This methodology was conceived as a case study analyzing a medium size construction with more than 18 years of activity and certified for almost 10 years with ISO9001 and level A in PBQP-H. We also conclude that this implementation process can be used in any developer and / or builder

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays lives up in an era of tight credit caused by the global financial crisis, as occurred in the past, it is the responsibility of various sectors and segments of society find ways to reinvent itself. In this context, Lean Construction presents itself as a strong alternative production management for companies in the construction segment. Arising out of lean thinking that originated in Japan in the postwar period and has spread around the world in times of extreme scarcity with the oil crisis. In practice the Lean Construction is a philosophy that seeks to improve the process of production management, maximizing the value of the flow from the customer's perspective through the elimination of losses. And thrives in environments and cultures that consider the scarcity of resources like something natural, applying both the macroeconomic crisis as in times of prosperity. The Planning and Production Control - PCP presents itself as a fundamental building block for companies to protect themselves in the face of economic fluctuations, seeking for their survival and success in the competitive market. Motivated by the lack of discussion of the topic in the local academy, and for the identification of 93.33% of construction companies that do not make use of methodological tools for PCP in the state, this dissertation aims to study and propose the implementation of lean construction in methodology of planning projects implemented on construction sites. This characterized the management system, of the production of a construction company, pointing out the main causes of ineffectiveness related to consequent low performance of one of his ventures. In sequence, the PCP was implemented with the use of tools to serve the principles of lean construction. This being monitored through indicators that provided managers managerial view of process of actions control and production of protective mechanisms. All implementation guidelines and application of this management model, were exposed in a simplified way, practical and efficient, in order to break the resistance of new practices and old paradigms in the industry.