74 resultados para Just-in-time (manufacturing system)

em Deakin Research Online - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste exchange is as a facilitator for construction and demolition waste deduction by reuse and recycling in construction projects. The just-in-time philosophy, which has been well cultivated in the manufacturing industry, is highly adoptable for demolition projects. Particularly, waste exchange that is usually performed after the actual demolition process can be shifted forward so that waste inventory from demolition is eliminated or reduced to facilitate waste reuse and recycling. A web-based waste exchange system is an ideal platform to enable communications among project participants before a demolition project commences so that waste materials can be sold before they are produced. Therefore, the productivity of the demolition project could be improved. This research paper aims to investigate and analyse the adoption of just-in-time philosophy in building demolition project management. It also describes the development of the proposed web-based waste exchange system that implements just-in-time demolition in detail, including its functionalities, information flows and major components.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The demolition activities of buildings produce numerous environmental pressures as a large proportion of demolition waste materials are sent to landfill directly in many projects. Web-based waste exchange systems could provide right solutions for releasing these pressures. Because the approaches adopted in current waste exchange systems are inefficient, these systems cannot generate waste exchange, not achieving their final goal, environmental protection. The Just-in-time (JIT) philosophy has been applied in the manufacture industry for decades and it is proven to be effective to eliminate or minimise inventory during production. This research aims to adopt the JIT philosophy into a demolition project management informapon system so that the system is more efficient in handling waste exchange. The system structure, key components and Just-in-time adoption are proposed and identified. Finally, a proto typed system is demonstrated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The recent deconstruction approach for demolition projects promotes reusing and recycling materials. However, the demolition project is interrupted and slowed down while the project team wait for the waste exchange process. Wasted materials generated from the demolition project have to be stored on demolition site or extra depository. Cost and time might be lost for the inventory of wasted materials and products. Just-in-Time (JIT) is a matured method widely used in manufacture industry as well as construction industry. It is utilised to reduce the inventory of both raw materials and final products. It is also used to shorten production cycle and improve the quality of the products. The JIT philosophy can be applied into demolition project so that the inventory of wasted materials can be eliminated and the project time can be shortened. To implement JIT demolition, the waste exchange process can be performed before the wasted materials are generated from the project. Material owners and demanders can virtually plan for waste handling before the demolition project is physically implemented. As a result, waste materials can be sent to demanders through transportation right after they are produced from the project. Applying JIT philosophy in demolition projects can effectively reduce the inventory of wasted materials and the amount of demolition waste to be sent to landfills. Therefore the cost and time of the project are reduced, and the quality of final delivered materials is improved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An Australian automotive component company plans to assemble and deliver seats to customer on just-in-time basis. The company management has decided to model operations of the seat plant to help them make decisions on capital investment and labour requirements. There are four different areas in seat assembly and delivery areas. Each area is modeled independently to optimise its operations. All four areas are then combined into one model called the plant model to model operations of seat plant from assembly to delivery. Discrete event simulation software is used to model the assembly operations of seat plant.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes a 'just-in-time' engagement framework for a high quality first year experience ('FYE'). The concept 'just-in-time' refers to a student-centered timeline for a managed learning environment based on the week-to-week experiences faced by a first year student in an Australian University semester. The engagement framework detailed in this paper consists of a series of teaching strategies embedded as part of a designed, integrated and co-ordinated first year program, expanding on the transition blueprint of Nelson, Kift, Humphreys & Harper (2006), working within a transition pedagogy (Kift, 2008) and implementing an institutional-wide program of collaborative engagement. This paper discusses the application of this framework to a first year foundational unit in the Bachelor of Laws degree at Deakin University, Victoria, Australia, implemented as part of an embedded institutional-wide transition program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lecture notes and recordings, tutorial exercises, readings, study questions, revision quizzes, instructional videos and crosswords were provided online so that students who could not attend classes (flexible learners) were not disadvantaged. D2L's progress viewing tool was used to track student access to resources, class attendance was monitored, and a questionnaire asked about the value of the online resources for completing the unit. While students thought it was important to attend classes, attendance was low and centred on tutorials and practical's, rather than lectures. The main reason for non-attendance was employment. Students accessed most of the online resources immediately prior to tests rather than on a week-by-week basis. Both attenders and flexible learners indicated that lecture notes, readings, revision quizzes and study questions were the most useful resources. Attenders accessed online resources more than flexible learners. There was only a weak correlation between class attendance and successful completion of the unit.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Product assembly is one of the most studied processes in modern manufacturing. In recent years a number of computer-based virtual reality systems have been proposed, developed and adopted by the manufacturing industries. Such systems have major advantages over conventional training practices for product assembly. Significant cost savings can be realized due to shorter training-scenario development times and reuse of existing engineering math models. In addition, the time span from the product design to full production can be shortened due to non-reliance on actual components and subsystems for training. Such training systems are effective if the knowledge required to be transferred is just process sequence such as assembly sequence. However, knowledge transfer for procedural and cognitive learning as well as skills development is very limited, due to the lack of user interactivity and immersion.

This talk will focus on a research technology platform where haptics and virtual reality are integrated to create an effective environment for production assembly operators’ training. In this system virtual reality provides the grounds for realistic visualization, as well as immersion, whereas haptics enforces physical constraints within the virtual world generating the feelings of realistic interaction, making it accessible for formal learning and better understanding during task performance.

The developed research technology platform imitates real physical training scenarios by providing comprehensive user interaction, constrained within the physical limitations of the real world. Through the utilization of a haptics device, providing realistic force feedback, users are able to engage in product assembly training with a stronger sense of ‘reality’.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The implementation of Kanban-based production control systems may be difficult in make-to-order environments such as job shops. The flexible manufacturing approach constitutes a promising solution to adapt the Kanban method to such environments. This paper presents an information flow modelling approach for specifying the operational planning and control functions of the Kanban-controlled shopfloor control system (KSCS) in a flexible manufacturing environment. By decomposing the KSCS control functionalities, we have created the system information flow model through the data flow diagrams of Structured Systems Analysis Methodology. The data flow diagrams serve effective system specifications for communicating the system operations to participants of different disciplines as well as the system model for the design and development of KSCS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chronic Fatigue Syndrome (CFS) is a debilitating condition in which severe, ongoing fatigue is the most prominent of a complex of somatic, psychological and neuropsychological symptoms. The aetiology of CFS remains uncertain and, to date, efforts to distinguish a clear pathophysiological profile for the disorder have been unsuccessful. Current evidence suggests that, rather than being a discrete disease entity with a single cause, CFS is a clinical condition resulting from the interaction of a number of pathophysiological factors, including acute infections, stress and psychiatric disorder. Recently, there has been some interest in the proposition that disordered circadian time-keeping may contribute to the development and/or course of the illness. The rationale for the investigation of circadian factors in CFS is based on the fact that disorders known to be associated with circadian dysregulation, such as jet lag and shiftwork related syndromes have a high degree of symptomatological overlap with CFS. Also, the presence of circadian disturbance could account, in part, for other phenomenological aspects of CFS, including the high rates of comorbid affective disturbance, and the reports of low-level immune dyregulation among sufferers. While several recent studies have produced some evidence of chronobiological dysregulation in CFS patients, much work remains before conclusions can be drawn about the presence, nature and clinical significance of circadian disturbance in CFS. This thesis describes a series of studies that were designed to systematically investigate: 1. whether CFS is associated with a state of circadian dysregulation, and 2. whether circadian dysregulation contributes significantly to the symptomatology of CFS. The first of the 5 studies reported here compared the circadian patterns of sleep-activity of CFS sufferers with those of healthy controls. Results indicated that CFS patients' sleep-activity cycles were significantly phase delayed compared to controls, and that some aspects of their circadian profiles of sleep-activity were related to some measures of sleep-disturbance and well-being. Studies 2 and 3 investigated the relationship between rhythms of sleep-wake and core temperature in CFS patients and healthy controls. The major finding from these studies was that sleep-wake and core temperature rhythms appear to be less effectively synchronised. Further evidence was collected that suggested that there was a relationship between circadian parameters and symptom measures in the CFS group. While this indicated that circadian dysregulation is linked in some way to the symptoms of CFS, assessment of the actual clinical significance of circadian disturbances required the use of a prospective methodology. The final two studies, therefore, report on a placebo-controlled trial of clinical interventions that were designed to restore circadian integrity to CFS patients, in order to see whether this would lead to a reduction in symptom number or severity. Results indicated that, although patients experienced improvements across a range of measures of symptoms and functional capacity, these were small in magnitude, of unlikely clinical significance, and no greater, in general, to improvements reported by patients who underwent placebo treatment. These results, along with those of the earlier studies, are discussed with respect to their implications regarding the presence and significance of circadian dysregulation. It is concluded that, while they provide evidence that CFS is associated with a degree of both internal and external circadian desynchrony, these findings suggest that circadian dysregulation is likely to be only a peripheral, contributor to the processes that generate and maintain the symptom complex. These findings are discussed with respect to how they contribute to our overall understanding of this multi-dimensional condition, and the implications they have for the continuing effort to investigate the causes and treatment of CFS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Labour productivity plays a significant role in economic growth, labour demand and employment situation of a particular economy. In this light, the presence of a structural break in productivity, and its unit root property, has important consequences for the overall economy and in major sectors such as manufacturing. In this article, using some recently developed unit root tests, we examine: (i) the null hypothesis of a unit root in the log-level of labour productivity for 38 manufacturing subdivisions against the alternative of trend stationarity over a three-decade period; and (ii) the presence of a structural break in the series, and whether the break has had a permanent or a transitory effect on manufacturing labour productivity. Our main finding is that shocks to labour productivity have had a transitory effect, implying that policies are likely to have only short-term effects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis analyses the issues of implementing real-time software systems in industrial applications. The benefit is the development of the Integrated Mega Project Development Model, to improve the effectiveness of planning and timely delivery of software, the quality of the delivered software and reducing problems associated with integrating software systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Programmed cell death (PCD), is a highly regulated and sophisticated cellular mechanism that commits cell to isolated death fate. PCD has been implicated in the pathogenesis of numerous neurodegenerative disorders. Countless molecular events underlie this phenomenon, with each playing a crucial role in death commitment. A precedent event, apoptotic volume decrease (AVD), is ubiquitously observed in various forms of PCD induced by different cellular insults. Under physiological conditions, cells when subjected to osmotic fluctuations will undergo regulatory volume increase/decrease (RVI/RVD) to achieve homeostatic balance with neurons in the brain being additionally protected by the blood-brain-barrier. However, during AVD following apoptotic trigger, cell undergoes anistonic shrinkage that involves the loss of water and ions, particularly monovalent ions e.g. K+, Na+ and Cl-. It is worthwhile to concentrate on the molecular implications underlying the loss of these cellular components which posed to be significant and crucial in the successful propagation of the apoptotic signals. Microarray and real-time PCR analyses demonstrated several ion and water channel genes are regulated upon the onset of lactacystin (a proteosomal inhibitor)-mediated apoptosis. A time course study revealed that gene expressions of water and ion channels are being modulated just prior to apoptosis, some of which are aquaporin 4 and 9, potassium channels and chloride channels. In this review, we shall looked into the molecular protein machineries involved in the execution of AVD in the central nervous system (CNS), and focus on the significance of movements of each cellular component in affecting PCD commitment, thus provide some pharmacological advantages in the global apoptotic cell death.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In industry, the workload and utilization of shop floor operators is often misunderstood. In this paper, we will present several real case studies, using Discrete Event Simulation (DES) models, which allow us to better understand operators in a batch manufacturing environment. The first study investigates labour in a machining plant consisting of multiple identical CNC machines that batch produce parts. The second study investigates labour in an eight station, gravity die casting rotary table. The results from these studies have shown that there can be potential improvements made by the production planners in the current labour configuration. In the first case study, a matrix is produced that estimates what the operator's utilization levels will be for various configurations. From this, the preferred operator to machine ratio over a range of cycle times is presented. In the second study, the results have shown that by reducing the casting cycle time, the operator would be overloaded. A discrete event simulation of these two cases highlighted areas that were misunderstood by plant management, and provided them with a useful decision support tool for production planning.