6 resultados para Production system

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is done to solve two issues for Sayid Paper Mill Ltd Pakistan. Section one deals with a practical problem arise in SPM that is cutting a given set of raw paper rolls of known length and width, and a set of product paper rolls of known length (equal to the length of raw paper rolls) and width, practical cutting constraints on a single cutting machine, according to demand orders for all customers. To solve this problem requires to determine an optimal cutting schedule to maximize the overall cutting process profitability while satisfying all demands and cutting constraints. The aim of this part of thesis is to develop a mathematical model which solves this problem.Second section deals with a problem of delivering final product from warehouse to different destinations by finding shortest paths. It is an operational routing problem to decide the daily routes for sending trucks to different destination to deliver their final product. This industrial problem is difficult and includes aspect such as delivery to a single destination and multiple destinations with limited resources. The aim of this part of thesis is to develop a process which helps finding shortest path.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This thesis is about new digital moving image recording technologies and how they augment the distribution of creativity and the flexibility in moving image production systems, but also impose constraints on how images flow through the production system. The central concept developed in this thesis is ‘creative space’ which links quality and efficiency in moving image production to time for creative work, capacity of digital tools, user skills and the constitution of digital moving image material. The empirical evidence of this thesis is primarily based on semi-structured interviews conducted with Swedish film and TV production representatives.This thesis highlights the importance of pre-production technical planning and proposes a design management support tool (MI-FLOW) as a way to leverage functional workflows that is a prerequisite for efficient and cost effective moving image production.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This master thesis presents a new technological combination of two environmentally friendly sources of energy in order to provide DHW, and space heating. Solar energy is used for space heating, and DHW production using PV modules which supply direct current directly to electrical heating elements inside a water storage tank. On the other hand a GSHP system as another source of renewable energy provides heat in the water storage tank of the system in order to provide DHW and space heating. These two sources of renewable energy have been combined in this case-study in order to obtain a more efficient system, which will reduce the amount of electricity consumed by the GSHP system.The key aim of this study is to make simulations, and calculations of the amount ofelectrical energy that can be expected to be produced by a certain amount of PV modules that are already assembled on a house in Vantaa, southern Finland. This energy is then intended to be used as a complement to produce hot water in the heating system of the house beside the original GSHP system. Thus the amount of electrical energy purchased from the grid should be reduced and the compressor in the GSHP would need fewer starts which would reduce the heating cost of the GSHP system for space heating and providing hot water.The produced energy by the PV arrays in three different circuits will be charged directly to three electrical heating elements in the water storage tank of the existing system to satisfy the demand of the heating elements. The excess energy can be used to heat the water in the water storage tank to some extent which leads to a reduction of electricity consumption by the different components of the GSHP system.To increase the efficiency of the existing hybrid system, optimization of different PV configurations have been accomplished, and the results are compared. Optimization of the arrays in southern and western walls shows a DC power increase of 298 kWh/year compared with the existing PV configurations. Comparing the results from the optimization of the arrays on the western roof if the intention is to feed AC power to the components of the GSHP system shows a yearly AC power production of 1,646 kWh.This is with the consideration of no overproduction by the PV modules during the summer months. This means the optimized PV systems will be able to cover a larger part of summer demand compared with the existing system.